Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A Partial Excavation Method of Steel Frame and Rock Wall Combination Vertical Brace for Rock Super-large Section Tunnel

A super-large cross-section and subdivided excavation technology, applied in tunnels, tunnel linings, shaft equipment, etc., can solve the problems of slow dismantling of support systems, instability of surrounding rock, and large excavation area, reducing construction and dismantling work. The effect of high capacity, accelerated construction speed and high foundation bearing capacity

Active Publication Date: 2019-10-25
CHINA TIESIJU CIVIL ENG GRP CO LTD +1
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] There are some problems in the above methods, such as complex construction procedures, multiple disturbances to the surrounding rock and difficulty in switching between various construction methods, long construction period, high cost, poor construction quality, etc.
[0008] In grade IV surrounding rock, grade III shallow buried and partial pressure sections, etc., the CD method is often designed for excavation, which has the characteristics of slow demolition of the temporary support system, long construction period, and high cost.
If the step method of middle partition is used for construction, the excavation area of ​​the middle partition of the upper step and the lower step will be too large at one time, which will easily cause the instability of the surrounding rock

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Partial Excavation Method of Steel Frame and Rock Wall Combination Vertical Brace for Rock Super-large Section Tunnel
  • A Partial Excavation Method of Steel Frame and Rock Wall Combination Vertical Brace for Rock Super-large Section Tunnel
  • A Partial Excavation Method of Steel Frame and Rock Wall Combination Vertical Brace for Rock Super-large Section Tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. The present invention is used in tunnels and underground structures with rock super-large sections (area greater than 170m2) 2 ), the section is divided into 5 parts according to the sequence of excavation, the upper half section is divided into two parts, the steel frame is used as the middle partition support in the middle to reduce the span of the section, and the lower half section is divided into three parts. Part, the middle part and the partition wall of the upper half section together form a vertical support, which will be dismantled after the deformation of the initial support is stable.

[0033] The specific method is:

[0034] 1) if figure 1 As shown, the section of the tunnel is divided into 5 parts, which are respectively described as Part 1—the upper left pilot tunnel (the first excavation part), Part 2—the upper right p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method for excavating a combined vertical erection branch part of a super-large rocky section tunnel steel frame rock wall. The method includes the specific steps that an excavation section of a tunnel is set, wherein an upper left pilot tunnel is a first excavation part, an upper right pilot tunnel is a second excavation part, the upper left pilot tunnel and the upper right pilot tunnel constitute an upper excavation section, a lower left pilot tunnel is a third excavation part, a lower right pilot tunnel is a fourth excavation part, a rock wall body is a fifth excavation part, the lower left pilot tunnel, the lower right pilot tunnel and the rock wall constitute a lower excavation part, and besides, a first supporting and protecting part, a second supporting andprotecting part, a third supporting and protecting part, a fourth supporting and protecting part and a fifth supporting and protecting part are included; the various excavation parts are excavated inturn, and primary support and protection is conducted on the corresponding supporting and protecting parts; in the entire excavation process, the second excavation part is kept lagging behind the first excavation part, the third excavation part lags behind the second excavation part, and the fourth excavation part lags behind the third excavation part. According to the method, large-scale machinery is convenient to work in the case of a super-large section tunnel, the excavation speed is fast, and the economic benefit is obvious.

Description

technical field [0001] The invention relates to the excavation field of rock super-large-section blasting method in tunnels and underground structures, in particular to a partial excavation method for rock super-large-section tunnel steel frame rock wall composite vertical braces. Background technique [0002] According to data, with the further development of my country's transportation industry, a large number of large-section tunnel projects have emerged. At present, in the construction of shallow large-section tunnels, step-by-step construction methods such as step method, CD method, CRD method and double-side pilot-pit method are mainly used at home and abroad. The main idea is to turn the large section into a small section and reduce the span of a single excavation of the tunnel, which is conducive to the stability and safety of the construction along the road. [0003] 1) Step method and step division method. Due to the influence of traditional construction methods, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/14E21D11/18E21D9/00
CPCE21D9/00E21D9/14E21D11/18
Inventor 余诚张振陈文尹金飞姚大闯李保文杜江山冯翼蒙赵耀
Owner CHINA TIESIJU CIVIL ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products