A technology of non-curing rubber and construction method, applied in construction, water conservancy engineering, building structure, etc., can solve the problems of loss of waterproof function, cracking of coating film, water in lap joints, etc., saving labor costs and simple maintenance in the later period. , The effect of reducing the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0062] A kind of building waterproof construction method utilizing non-cured rubber asphalt, described construction method comprises the following steps:
[0063] (a) Grassroots treatment: first, treat the grassroots of the building to be constructed, remove dust, dirt, mortar blocks and other attachments on the grassroots, and ensure that the grassroots is flat, solid, clean and free of clear water;
[0064] (b) Hot-melt coating and scraping of non-cured rubber asphalt: after the treatment of the base layer, pour the non-cured rubber asphalt into the heating tank for heating. The coating thickness of rubber asphalt is 2mm;
[0065] (c) Attach waterproof membrane: 1 minute after step (b) of non-cured rubber asphalt coating is completed, the waterproof membrane is laid on the non-cured rubber asphalt, and the overlapping length between adjacent membranes is 100mm;
[0066] (d) Coil edge treatment: apply non-curing rubber asphalt evenly on the two bonding surfaces of the edge c...
Embodiment 2
[0068] A kind of building waterproof construction method utilizing non-cured rubber asphalt, described construction method comprises the following steps:
[0069] (a) Grassroots treatment: first, treat the grassroots of the building to be constructed, remove dust, dirt, mortar blocks and other attachments on the grassroots, and ensure that the grassroots is flat, solid, clean and free of clear water;
[0070] (b) Hot-melt coating and scraping of non-cured rubber asphalt: after the treatment of the base layer, pour the non-cured rubber asphalt into the heating tank for heating. The coating thickness of rubber asphalt is 4mm;
[0071] (c) Attach waterproof membrane: 3 minutes after step (b) of non-cured rubber asphalt coating is completed, the waterproof membrane is laid on the non-cured rubber asphalt, and the overlapping length between adjacent membranes is 120mm;
[0072] (d) Coil edge treatment: apply non-curing rubber asphalt evenly on the two bonding surfaces of the edge ...
Embodiment 3
[0074] A kind of building waterproof construction method utilizing non-cured rubber asphalt, described construction method comprises the following steps:
[0075] (a) Grassroots treatment: first, treat the grassroots of the building to be constructed, remove dust, dirt, mortar blocks and other attachments on the grassroots, and ensure that the grassroots is flat, solid, clean and free of clear water;
[0076] (b) Hot-melt coating and scraping of non-cured rubber asphalt: after the treatment of the base layer, pour the non-cured rubber asphalt into the heating tank for heating. The coating thickness of rubber asphalt is 3mm;
[0077] (c) Attaching waterproof membrane: 2 minutes after step (b) of non-cured rubber asphalt coating is completed, the waterproof membrane is laid on the non-cured rubber asphalt, and the overlapping length between adjacent membranes is 110mm;
[0078] (d) Coil edge treatment: apply non-curing rubber asphalt evenly on the two bonding surfaces of the ed...