Pile driver for construction engineering
A technology of construction engineering and pile driver, which is applied in the direction of construction, foundation structure engineering, sheet pile wall, etc. It can solve the problems of pile driving head stuck in the soil, slow piling speed, and low piling efficiency, so as to prevent the soil from sticking and facilitate piling. , The effect of speeding up the piling speed
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2020-09-15
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of mechanical devices, in particular to a pile driver for construction engineering. Background technique
[0002] Pile drivers are one of the important equipment for infrastructure construction in the construction industry. With the increase of people's demand for housing and the accelerated construction of commercial buildings, the use of pile drivers is becoming more and more frequent. Traditional pile drivers are due to high manufacturing costs and low efficiency. The problem has been unable to meet the needs of modern rapid construction. At the same time, the situation at the piling site has become very complicated with the emergence of different equipment. Sometimes piling needs to be carried out on uneven ground or because a large number of equipment needs to work at the same time, one direction The traditional pile driver cannot work by adjusting the angle, and can only rely on the adjustment of the o...
Examples
Embodiment approach
[0027] As an embodiment of the present invention, the piling column 5 is divided into two parts: a column body 52 and a piling head 53; the column body 52 is hollow, and the lower end of the column body 52 is provided with a third opening 54; The three openings 54 are ring-shaped design; the upper end of the piling head 53 penetrates into the third opening 54 and is fixedly connected with a first extruding block 55, and the first extruding block 55 slides in the third opening 54; on the third opening 54 The inner wall is fixed with a second extruding block 56; the first extruding block 55 and the second extruding block 56 are all ring-shaped; the inner wall of the cylinder 52 is fixed with a bearing plate 57; the object bearing plate 57 Circular design, and the lower surface of the bearing plate 57 is fixedly connected with a cylinder, which communicates with the third opening 54; the protruding end of the cylinder is fixedly connected with a striking plate 58; the piling head ...