Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

32results about How to "Fast piling speed" patented technology

Adjustable type piling machine for civil engineering

InactiveCN107829430AFast piling speedAvoid piles becoming crookedBulkheads/pilesElectric machineryCrankshaft
The invention discloses an adjustable type piling machine for civil engineering. The adjustable type piling machine comprises a door-shaped supporting plate, a supporting rod, a first electric pushingrod, a mounting plate, a crankshaft, a motor, a connecting rod shaft neck, a slide block, a connecting rod, a bolt, a sleeve, a first connecting rod, a second connecting rod, a second electric pushing rod and supporting devices, wherein each supporting device comprises a first semicircular plate, a spring and a second semicircular plate. The adjustable type piling machine is equipped with the first electric pushing rod and the supporting rod, can regulate a piling direction according to the working needs, is equipped with the motor, the crankshaft, the connecting rod, the connecting rod shaftneck, the slide block and the bolt, drives a piling hammer to move up and down, continuously piles, is high in piling speed, can regulate piling depth; the supporting devices are arranged, each supporting device comprises the first semicircular plate, the spring and the second semicircular plate, and the two supporting plates co-support a pile, so that the pile is prevented from being inclined orother unforeseen circumstances in a piling process; and moreover, the spring is arranged, so that the adjustable type piling machine can be suitable for piles of different thicknesses.
Owner:伍超群

Pipeline construction method of excavating groove and burying pipe

InactiveCN110593375AEasy constructionShort walking routeSewer pipelinesSteel platesCushion
The invention relates to a pipeline construction process, discloses a pipeline construction method of excavating a groove and burying a pipe, and solves the technical problem of poor protection measures for the side wall of a pipe groove at present. The pipeline construction method comprises the steps of S1, carrying out preparation work at the early stage of construction; S2, digging the groove;S3, driving steel plate piles in a trench for supporting; S4, digging soil for supporting, and excavating the trench; S5, putting a cushion; S6, hoisting and laying a pipeline; S7, carrying out leakage check; S8, encasing the pipeline with concrete; S9, backfilling the trench; S10, pulling out the steel plate piles; and S11, clearing the site, removing a stopper, and completing pipe burying construction. According to the technical scheme, the steel plate piles are inserted into the trench for supporting, meanwhile a single driving method is adopted to accelerate the pile driving speed, and guide piles are arranged at regular intervals, so the pile driving direction is good, and therefore the purpose of good protection for the side wall of the pipe groove is achieved.
Owner:上海景铭建设发展有限公司

Drill of high pressure water jet long screw pile driver

The invention discloses a drill of a high pressure water jet long screw pile driver, comprising a drill body, a high pressure water generating and control device and a high pressure eater jet pipe, wherein the high pressure water generating and control device is connected with a jet nozzle at front end of the drill body through the high pressure water jet pipe, the high pressure water jet pipe is fixed on a hollow long screw rod and the inner wall of the drill body through clips; and a connecting and fixing lug is arranged at the outside of the upper part of the drill body. The invention has the advantages of low energy consumption and pile driving cost, no secondary pollution generated by the high pressure water jet, high pile driving speed and wild applicable scope.
Owner:李新桥

Combined hammer head for hydraulic pile hammer

ActiveCN104404959AAchieving Continuous OrientationAdjust qualityBulkheads/pilesPiston rodMetal
The invention discloses a combined hammer head for a hydraulic pile hammer. The combined hammer head is applied to a pile hammer hammering system of the hydraulic pile hammer in a pile basis construction. The hammer head comprises a hammer body with a hollow interior; a striking head is arranged at the bottom of the hammer body; an oil cylinder piston rod is connected with the top of the hammer body; a metal grain filler is filled in the hollow cavity of the hammer body; the hammer body is formed by stacking and connecting a plurality of metal plates; a lower plate at the bottom and an upper plate at the top are closed; a plurality of middle plates in the middle are arranged as frame-shaped hollow plates; after the frame-shaped hollow plates are stacked, the hollow cavity in the hammer body is formed. According to the invention, the stress waveform during a striking process of the hammer head is effectively improved, the peak of the stress waveform is reduced to the lowest required value and the transferring time of the stress waveform under a peak state is prolonged, the transferring efficiency of the strike energy and the piling speed are increased while the impact force endured by the pile hammer and the pile is reduced, the service life of the pile hammer is prolonged and the pile is protected from being damaged.
Owner:CENT SOUTH UNIV +1

Prefabricated UHPC tubular pile with thread and manufacturing and construction method of prefabricated UHPC tubular pile

The invention relates to a prefabricated UHPC tubular pile with a thread and a manufacturing and construction method of the prefabricated UHPC tubular pile. The prefabricated UHPC tubular pile with the thread comprises a concrete tubular pile body. The concrete tubular pile body is composed of a pile cap, a pile body and a pile bottom cone. The pile cap is arranged on the upper portion of the pile body, the pile bottom cone is in an inverted cone shape and is arranged on the lower portion of the pile body, spiral concrete ribs are arranged on the periphery of the pile body from top to bottom, the concrete ribs spirally stretch to the pile cap from the pile bottom cone at equal thread pitches, and alloy steel sheets are arranged on the surfaces of the concrete ribs. The tubular pile is simple in structure and good in strength, the settling problem of a pile foundation is relieved, the advantages of being good in fluidity and high in strength of super-high performance concrete are utilized, the concrete ribs have high strength, can bear high soil pressure without being pressed to be damaged, and can provide large mechanical engaging force and frictional resistance, the surfaces of the concrete ribs are wrapped by the alloy steel sheets, the concrete ribs are well protected, the concrete tubular pile body looks like a drill with a blade, the pile body can be rotationally pressed in for piling construction, and piling speed is greatly increased.
Owner:FUZHOU UNIV

Three-dimensional movable SCP forming system in centrifugal test

The invention relates to a three-dimensional movable SCP forming system in a centrifugal test. The system is composed of a sleeve, a piston, sliding wheel assemblies and a hand-powered heavy piling hammer, wherein the sleeve and the piston are needed in the piling process. The sleeve is a hollow cylinder. The piston is a cylindrical rod. The verticality of the sleeve which is clamped in the middle is guaranteed through four sliding wheelslocated on the two sides of the sleeve. Sliding chutes can be connected with a model box used in the test through bolts at the two ends and are fixed above the model box. The hand-powered heavy piling hammer is composed of an upper hand-powered structure and lower guide rails. The upper hand-powered structure can drive the heavy hammer to reciprocate upwards and downwards by shaking a handle of the upper hand-powered structure, so that the heavy hammer strike the top of the piston downwards, and sand is compacted through the piston; meanwhile, a wheel at the top of the upper hand-powered structure is rotated, so that the heavy hammer and a linkage structure of the heavy hammer move upwards and downwards, and the position is adjusted. The lower guide rails comprise two sets of guide rails which are mutually perpendicular on the horizontal plane. The upper hand-powered structure can slide freely in the direction of two guide rails. According to the three-dimensional movable SCP forming system, the SCP forming process can be really simulated in the centrifugal model test; the three-dimensional movable SCP forming system is not only convenient to use and efficient, but also capable of guaranteeing verticality, continuity, compactness and the like of a sand pile, thereby being capable of well providing service for relevant research work.
Owner:TONGJI UNIV +1

Pile driver for architectural engineering

ActiveCN109440768APrevent the phenomenon of sticking soilFast piling speedBulkheads/pilesMechanical devicesSurface friction
The invention belongs to the technical field of mechanical devices, and particularly discloses a pile driver for architectural engineering. The pile driver for architectural engineering comprises a base; a fifth gear and a second gear transmit through a belt; the belt is a styrene thermoplastic elastomer, has high elasticity, high surface friction coefficient and higher transmission power, and isnot prone to being broken; the surface of a piling column is fixedly connected with a ring gear in a sleeving mode; the ring gear meshes with a sixth gear; the piling column is divided into two partsof a column body and a piling head; the column body is hollow, and a third opening is formed in the lower end of the column body; a bearing plate is circular, a cylinder is fixedly connected to the lower surface of the bearing plate, and the cylinder communicates with the third opening; a beating plate is fixedly connected to the extending end of the cylinder; the piling head is solid, and the intensity of the piling head can be improved; and a first extruding block and a second extruding block are made of magnet, and opposite magnetic poles are opposite. According to the pile driver for architectural engineering, the piling efficiency is high, the operation is simple and convenient, and the piling head is not prone to being damaged and has long service life.
Owner:上海建元工程股份有限公司

Piling method of spiral steel pile

A piling method of a spiral steel pile includes that firstly a deep hole equal to burial depth of the spiral steel pile is punched through a punch, and then the spiral steel pile is screwed into the deep hole through an offsetting machine. The punch comprises a base frame, a motor, a winch, a pulley, a steel wire rope, a heavy hammer and a punching rod. The offsetting machine comprises a machine frame, a hydraulic motor, a hydraulic pump, two hydraulic columns, a sliding plate assembly, a rotary pile motor, an automobile stirring shaft, a geneva wheel, a bidirectional hydraulic jack and a hydraulic adjusting rod. During punching, the punching rod is arranged below the heavy hammer and is hit into earth through free falling of the heavy hammer. During offsetting, the spiral steel pile is connected on the lower surface of the geneva wheel, and the rotary pile motor and the hydraulic motor drive the geneva wheel to rotate horizontally and simultaneously move downwards so as to screw the spiral steel pile into the deep hole. The piling method can prevent the spiral steel pile from being damaged by stones or hard objects in the punching process, reduces damage probability of the steel pile, and is suitable for operating in various environments and geological conditions.
Owner:SHANGHAI SOLAR ENERGY S&T

Pre-stressed concrete compression pipe pile tension connector without end plate and pipe pile

PendingCN111809617APre-tensioning work is tightClosely connectedBulkheads/pilesPre stressPipe
The invention discloses a pre-stressed concrete compression pipe pile tension connector without an end plate. The pre-stressed concrete compression pipe pile tension connector without an end plate comprises an expansion shell, a first sealing cover, an expansion connecting pin and a wedge-shaped part, wherein a through groove penetrating through both ends is formed in the expansion shell, the through groove comprises an extending section and a clamping section, the inner diameter of the clamping section is larger than that of the extending section, a first sleeve is arranged at the end, corresponding to the extending section, of the expansion shell, and an inner thread is arranged on the first sleeve; the first sealing cover is fixed to the end, corresponding to the clamping section, outside the expansion shell, and a first through hole is formed in the first sealing cover; the expansion connecting pin comprises a connecting section and an expansion section, an expansion groove is formed in the expansion section, the expansion groove extends axially from the end part of the expansion part to the connecting section, the expansion section is divided into at least two parts through the expansion groove, and the expansion section extends into the expansion shell; and the wedge-shaped part comprises a head part and a tail part, the outer surface of the wedge-shaped part is graduallyclosed inward from the head part to the tail part, and the wedge-shaped part extends into the expansion section along the expansion groove from the tail part to expand the expansion section. According to the pre-stressed concrete compression pipe pile tension connector without the end plate, materials are saved, the structure is simple, but connection is more reliable, and use is more convenient.
Owner:JIAXING WEIKAI MACHINERY CO LTD

Adjustable pile driver for building construction

InactiveCN109137906AAdjust range of motionEasy to moveBulkheads/pilesTerrainArchitectural engineering
The invention discloses an adjustable pile driver for building construction. The adjustable pile driver comprises an n-shaped frame, a pile driving hammer, mounting plates, first threaded rods, firstsleeves, connecting rods, mounting rods, wheels, a first motor, a first rotating shaft, a second rotating shaft, second threaded rods, horizontal rods, second sleeves, a link rod, a fixing rod and a guiding device. The guiding device comprises a second motor, a bidirectional screw rod, the second sleeves and an arc plate. The adjustable pile driver is provided with the first threaded rods, the connecting rods, the mounting rods and the wheels, and thus the whole device can be stably supported and fixed and can conveniently move; the first motor, the first rotating shaft, the second rotating shaft, the second threaded rods, the horizontal rods, the second sleeves and the link rod are arranged, and thus continuous pile driving can be achieved, the pile driving speed is high, and work efficiency is high; the pile driving depth can be adjusted, and the pile driver meets different terrain and working requirements and is high in practicability; and the guiding device is arranged to limit a pile so as to prevent skewing of the pile.
Owner:杜鑫

Water flushing vibroflotation machine

The invention relates to a water flushing vibroflotation machine. The water flushing vibroflotation machine comprises a gravity rod and a vibroflotation submersible pump. The vibroflotation submersible pump is arranged on the gravity rod, the vibroflotation submersible pump is provided with a cable, an anchor body clamping port is formed in the bottom of the gravity rod, the vibroflotation submersible pump is provided with a water outlet and a water inlet, the water outlet of the vibroflotation submersible pump communicates with a water inlet hole of the gravity rod, the gravity rod is internally provided with a fluid passage, and the fluid passage communicates with the water inlet hole. The water flushing vibroflotation machine realizes vibroflotation and water supply by the vibroflotation submersible pump, the vibroflotation and water supply are integrated, water flushing and vibroflotation are realized during piling, the piling speed is accelerated, use is more convenient, and the water flushing vibroflotation machine is suitable for cases of piling under water, can reduce the inclination during work and can maintain vertical when piling is performed.
Owner:相城区黄桥宜智机电技术服务部

Automatic construction equipment for urban and rural reservoirs

InactiveCN108239965AStrong rigid support functionAutomate constructionDerricks/mastsCoastlines protectionArchitectural engineeringSelf-stabilization
The invention relates to automatic construction equipment for urban and rural reservoirs. The automatic construction equipment comprises a self-stabilization travelling device, wherein the self-stabilization travelling device is capable of realizing the functions of self-stabilization travelling and rigid supporting, and capable of automatically travelling on bumpy and uneven grounds of the reservoirs for construction; meanwhile, the self-stabilization travelling device can also be used as a rigid supporting platform in a construction process for the reservoirs; a slope wall cleaning device isinstalled at the right side of the upper end surface of the self-stabilization travelling device; the slope wall cleaning device is capable of realizing the function of automatically clipping dead twigs and vines on the slope walls of the reservoirs; an automatic piling device is installed at the left side of the upper end surface of the self-stabilization travelling device; and the automatic piling device is capable of realizing the function of automatically and efficiently piling on a protection slope. The automatic construction equipment disclosed by the invention is capable of realizing the function of clipping-piling integrated automatic construction for the reservoirs, does not need manual operation, and is high in reservoir construction speed and working efficiency, and capable ofautomatically travelling on the bumpy and uneven grounds of the reservoirs for construction and realizing mechanical automatic step-by-step construction.
Owner:郑磊

Novel vibration pile driver for engineering machinery

The invention discloses a novel vibration pile driver for engineering machinery. The novel vibration pile driver comprises a moving cavity, a vibration motor, a pushing plate, a column head, an auxiliary supporting rod, a supporting column, a hydraulic supporting column and a bottom plate, wherein the vibration motor is arranged in the moving cavity, the right side of the vibration motor is connected with the pushing plate, two vibration rods are arranged on the lower side of the vibration motor, a cushioning rod is arranged at the lower ends of the two vibration rods, the lower end of the cushioning rod is connected with a component force rod, a connecting rod is arranged at the lower end of the component force rod, a motor is arranged in the middle of the connecting rod, and the column head is arranged at the lower end of the connecting rod. According to the novel vibration pile driver, the vibration motor, the motor and the column head are arranged, so that double power is providedfor pile driving work, and the pile driving speed is increased; the moving cavity, the pushing plate and a telescopic motor are arranged, so that the vibration motor can move transversely; and a second motor is arranged, so that the moving cavity can be rotated, the pile driving position can be accurately adjusted and controlled, and the pile driving effect can be improved.
Owner:徐州市贾汪区羡人工贸有限公司

Automatic piling device for communication signal tower construction

The invention relates to an automatic piling device for communication signal tower construction. The automatic piling device for communication signal tower construction comprises a piling support plate, wherein a piling vertical plate is arranged on the upper side of the front end surface of the piling support plate; a bidirectional drive motor is arranged on the lower side of the upper end surface of the piling vertical plate; winding wheels are arranged on two output shafts of the bidirectional drive motor; steel strands are wound on the winding wheels; the lower ends of the steel strands are fixed onto a connecting hook; the connecting hook is arranged on a piling table; pilling support pillars are symmetrically arranged at the rear end of the piling table and are matched with piling sliding chutes to move; the piling sliding chutes are formed in the piling support plate; a reciprocating hammering mechanism is arranged on the rear side of the upper end surface of the piling table; and a damping and pushing mechanism is arranged in the middle of the upper end surface of the piling table. The automatic piling device for communication signal tower construction provided by the invention can solve the problems that according to an existing protection slope piling process method during communication signal tower construction, piles are manually driven in a protection slope, the piling speed is low, the piling efficiency is low, the hands of workers are easy to hurt by vibration, and the like.
Owner:JINHUA MANGO INFORMATION TECH CO LTD

A kind of intelligent piling equipment for geotechnical engineering

The invention relates to intelligent piling equipment for geotechnical engineering. The intelligent piling equipment comprises a bottom plate and is mounted on existing large-scale walking equipment through the bottom plate, and the intelligent piling equipment is driven by the existing large-scale walking equipment to automatically walk on a river channel. A sloping wall cleaning device is installed on the right side of the upper end surface of the bottom plate. The sloping wall cleaning device can realize the function of automatically trimming dead branches and vines on the sloping wall of the river channel. An automatic piling device is mounted on the left side of the upper end surface of the bottom plate. The automatic piling device can realize the function of automatically and efficiently piling on a protection slope. By the adoption of the intelligent piling equipment, the functions of automatic trimming and piling construction of the geotechnical engineering protection slope canbe realized, no manual operation is needed, the river channel construction speed is high, the working efficiency is high, and the intelligent piling equipment has the beneficial effects that the deadbranches and vines on the slope wall of the river channel are automatically trimmed, automatic auxiliary binding is carried out during trimming, the trimming speed is high, the trimming efficiency ishigh, automatic piling on the protection slope is realized, the piling speed is high, and the piling efficiency is high.
Owner:朱新科

Threaded prefabricated uhpc pipe pile and its manufacturing and construction method

The invention relates to a prefabricated UHPC tubular pile with a thread and a manufacturing and construction method of the prefabricated UHPC tubular pile. The prefabricated UHPC tubular pile with the thread comprises a concrete tubular pile body. The concrete tubular pile body is composed of a pile cap, a pile body and a pile bottom cone. The pile cap is arranged on the upper portion of the pile body, the pile bottom cone is in an inverted cone shape and is arranged on the lower portion of the pile body, spiral concrete ribs are arranged on the periphery of the pile body from top to bottom, the concrete ribs spirally stretch to the pile cap from the pile bottom cone at equal thread pitches, and alloy steel sheets are arranged on the surfaces of the concrete ribs. The tubular pile is simple in structure and good in strength, the settling problem of a pile foundation is relieved, the advantages of being good in fluidity and high in strength of super-high performance concrete are utilized, the concrete ribs have high strength, can bear high soil pressure without being pressed to be damaged, and can provide large mechanical engaging force and frictional resistance, the surfaces of the concrete ribs are wrapped by the alloy steel sheets, the concrete ribs are well protected, the concrete tubular pile body looks like a drill with a blade, the pile body can be rotationally pressed in for piling construction, and piling speed is greatly increased.
Owner:FUZHOU UNIV

Auxiliary construction equipment for bridge construction

The invention relates to auxiliary construction equipment for bridge construction. The auxiliary construction equipment comprises a self-stabilization walking device, and the self-stabilization walking device can achieve the functions of self-stabilization walking and rigid supporting, can automatically walk on the rugged bridge construction ground full of bumps and hollows for construction and can also be used as a rigid supporting platform in the bridge construction process; an automatic stone laying device is arranged on the front side of the upper end surface of the self-stabilization walking device and can achieve the functions of automatically conveying and stacking stone masonry and correcting the position; and an automatic piling device is arranged on the left side of the upper endsurface of the self-stabilization walking device and can achieve the function of automatic and efficient piling on a revetment. According to the auxiliary construction equipment, the functions of full-automatic revetment constructing and reinforcing steel bar column hammering of a bridge can be realized, manual operation is not needed, the bridge construction speed is high, the working efficiencyis high, the function of automatically walk on the rugged bridge construction ground full of bumps and hollows for construction can be achieved, and mechanical and automatic step-by-step constructioncan be realized.
Owner:周兵经

Drill of high pressure water jet long screw pile driver

The invention discloses a drill of a high pressure water jet long screw pile driver, comprising a drill body, a high pressure water generating and control device and a high pressure eater jet pipe, wherein the high pressure water generating and control device is connected with a jet nozzle at front end of the drill body through the high pressure water jet pipe, the high pressure water jet pipe isfixed on a hollow long screw rod and the inner wall of the drill body through clips; and a connecting and fixing lug is arranged at the outside of the upper part of the drill body. The invention has the advantages of low energy consumption and pile driving cost, no secondary pollution generated by the high pressure water jet, high pile driving speed and wild applicable scope.
Owner:李新桥

Pile driving equipment convenient for rural left-behind elderly to surround vegetable gardens

The invention relates to the technical field of household equipment, in particular to pile driving equipment convenient for rural left-behind elderly to surround vegetable gardens, and solves the problem of difficult pile driving in surrounding of the vegetable gardens by the left-behind elderly. The pile driving equipment convenient for the rural left-behind elderly to surround the vegetable gardens comprises a base box; arc support plates are welded on two sides of the bottom of the base box; a movable port at the top of the base box is fixedly connected with an annular column; a hammering device is arranged outside the annular column; a kinetic energy transfer device and a kinetic energy storage device are arranged in the base box; and a kinetic energy generation device is arranged at the top of the base box. The pile driving equipment convenient for the rural left-behind elderly to surround the vegetable gardens saves a lot of electric consumption, reduces the cost, is simple in operation, reduces the consumption of vision and physical strength in the operation process, and accelerates the pile driving speed to enable the left-behind elderly to have more time to chat and play cards.
Owner:吕登敬

Moving method of carbon dioxide gas cylinders for pile splicing welding along with pile machine

A moving method of carbon dioxide gas cylinders for pile splicing welding along with a pile machine is characterized by comprising the following steps that firstly, U-shaped ring sleeves are manufactured; and secondly, the U-shaped ring sleeves are installed on a base of the pile machine. The moving method of the carbon dioxide gas cylinders for pile splicing welding along with the pile machine has the beneficial effects that the U-shaped ring sleeves are simple in structure and convenient to manufacture, the carbon dioxide gas cylinders become the constituent part of the pile machine through the U-shaped ring sleeves, it is not required to move the gas cylinders or drag pipelines manually, the labor intensity is reduced, ground dragging pipelines on the ground around the pile machine are reduced and appear more tidy, operations and walking are more convenient and flexible, and the construction area is safer; and a procedure for waiting for the carbon dioxide gas cylinders after the pile machine is moved is omitted, and the piling speed is increased.
Owner:MCC5 GROUP CORP SHANGHAI

Combined type steel plate pile enclosure structure and construction method thereof

The invention relates to a combined type steel plate pile enclosure structure and discloses the combined type steel plate pile enclosure structure and a construction method thereof. The combined typesteel plate pile enclosure structure comprises H-shaped steel and cap-shaped steel plates, and the H-shaped steel and the cap-shaped steel plates are distributed alternately and connected side by side; each H-shaped steel comprises a web plate, a short-wing margin plate and a long-wing margin plate, and the short-wing margin plates and the long-wing margin plates are perpendicular to the web plates; the two side edges of each long-wing margin plate are provided with a first buckling part and a first locking part correspondingly; each cap-shaped steel plate comprises a center web plate; the twoside edges of each center web plate are inclined to the same side face of the center web plate and extend outwards to form slant shoulder parts; every two slant shoulder parts are symmetrically arranged with the middle axis of the corresponding center web plate as the axis; the edges of every two slant shoulder parts horizontally and outwardly extend to form extending arms; the edges of every twoextending arms are provided with a second buckling part and a second locking part correspondingly; and the second buckling parts and the second locking parts and the first buckling parts and the first locking parts are connected in cooperation. The combined type steel plate pile enclosure structure is large in anti-bending strength, convenient to construct and connect, high in construction accuracy rate and high in construction quality controllability.
Owner:CHINA STATE CONSTRUCTION ENGINEERING CORPORATION +1

Isolation construction equipment for hospital for infectious diseases

The invention relates to isolation construction equipment for a hospital for infectious diseases. The isolation construction equipment comprises a bottom plate. The isolation construction equipment ismounted on existing large traveling equipment through the bottom plate, and the isolation construction equipment is driven by the existing large traveling equipment to automatically travel on the isolated protection slope ground; and an automatic stone-laying device is mounted on the front side of the upper end face of the bottom plate, the functions of grouted rubble automatic carrying and stacking and position correcting can be achieved through the automatic stone-laying device, and an automatic piling device is mounted on the left side of the upper end face of the bottom plate. According to the isolation construction equipment, the difficult problems that as for an existing isolated protection slope building mode, the needed labor personnel are many, the labor intensity is large, the isolated protection slope building speed is low, the working efficiency is low, grouted rubble needs to be manually carried, the grouted rubble is manually corrected and stacked in order, the carryingand stacking speeds are low, the grouted rubble correcting precision is low, the protection slope building speed is low, piling is manually conducted on a protection slope, the piling speed is extremely low, the piling efficiency is low, and hands of labor workers are prone to being injured under shocking can be solved.
Owner:任帅帅

A method for compacting a building foundation

The invention belongs to the technical field of mechanical devices, and particularly relates to a construction foundation compaction method. The method comprises the following steps that a groove is arranged in the surface of a piling column of a pile driver for construction engineering, an extrusion plate is arranged in the groove, the arc surface of the extrusion plate is designed, one end of the extrusion plate along the forward direction of the piling column is attached to the surface of the piling column, and the extrusion plate and the piling column are connected through hinges; water channels are arranged in the extrusion plate, and water holes communicated with the water channels are uniformly arranged in the surface of the extrusion plate, and a water tank is fixedly connected tothe inner wall of the piling column of the pile driver for construction engineering, the water tank is filled with dilute cement, and the water tank is communicated with the water channels. Accordingto the method, the pile driver for the construction engineering comprises a base; the piling column is divided into two parts, namely a column body and a piling head; the extending end of an air cylinder is fixedly connected with a striking plate; the solid design of the piling head can enhance the strength of the piling head; a first extrusion block and a second extrusion block are made of magnets, and the specific magnetic poles are opposite. The method has the advantages that the piling efficiency is high, the pot holes are not easy to collapse, manpower and material resources are saved, and the operation is simple and convenient.
Owner:广东正上工程管理有限公司

Pile driver for construction engineering

ActiveCN109440768BPrevent the phenomenon of sticking soilFast piling speedBulkheads/pilesElastomerGear wheel
The invention belongs to the technical field of mechanical devices, and particularly discloses a pile driver for architectural engineering. The pile driver for architectural engineering comprises a base; a fifth gear and a second gear transmit through a belt; the belt is a styrene thermoplastic elastomer, has high elasticity, high surface friction coefficient and higher transmission power, and isnot prone to being broken; the surface of a piling column is fixedly connected with a ring gear in a sleeving mode; the ring gear meshes with a sixth gear; the piling column is divided into two partsof a column body and a piling head; the column body is hollow, and a third opening is formed in the lower end of the column body; a bearing plate is circular, a cylinder is fixedly connected to the lower surface of the bearing plate, and the cylinder communicates with the third opening; a beating plate is fixedly connected to the extending end of the cylinder; the piling head is solid, and the intensity of the piling head can be improved; and a first extruding block and a second extruding block are made of magnet, and opposite magnetic poles are opposite. According to the pile driver for architectural engineering, the piling efficiency is high, the operation is simple and convenient, and the piling head is not prone to being damaged and has long service life.
Owner:上海建元工程股份有限公司

An agricultural protective fence piling equipment

The invention relates to pile driving equipment, in particular to the pile driving equipment of protective fences for agriculture. According to the pile driving equipment of the protective fences foragriculture, the labor intensity is low, the piling speed is high, and a wood pile is not prone to incline. The pile driving equipment of the protective fences for agriculture comprises a bottom plate, wheels, a first guide rod, a limiting rod and the like, wherein the wheels are symmetrically mounted on the left side and the right side of the bottom of the bottom plate, a first through hole is formed in the front side of the middle part of the bottom plate, and a fixing device is arranged on the left side of the top of the bottom plate; the first guide rod is mounted on the right side of thetop of the bottom plate, two sliding sleeves matched with the first guide rod are arranged on the first guide rod, and a vertical plate is mounted between the left side faces of the two sliding sleeves. According to the equipment, the wood pile can be pressed tightly and fixed by means of the fixing device, so that the wood pile is prevented from inclining when being hit into the land; through a lifting device, an operator does not need to pull the sliding sleeves to enable a hammer head to move upwards, so that time and labor are saved, and the effects that labor intensity is low, the pilingspeed is high and the wood pile is not prone to incline are achieved.
Owner:菏泽市鑫怡新能源有限公司

Combined hammer head for hydraulic piling hammer

ActiveCN104404959BAchieving Continuous OrientationAdjust qualityBulkheads/pilesPiston rodMetal
The invention discloses a combined hammer head for a hydraulic pile hammer. The combined hammer head is applied to a pile hammer hammering system of the hydraulic pile hammer in a pile basis construction. The hammer head comprises a hammer body with a hollow interior; a striking head is arranged at the bottom of the hammer body; an oil cylinder piston rod is connected with the top of the hammer body; a metal grain filler is filled in the hollow cavity of the hammer body; the hammer body is formed by stacking and connecting a plurality of metal plates; a lower plate at the bottom and an upper plate at the top are closed; a plurality of middle plates in the middle are arranged as frame-shaped hollow plates; after the frame-shaped hollow plates are stacked, the hollow cavity in the hammer body is formed. According to the invention, the stress waveform during a striking process of the hammer head is effectively improved, the peak of the stress waveform is reduced to the lowest required value and the transferring time of the stress waveform under a peak state is prolonged, the transferring efficiency of the strike energy and the piling speed are increased while the impact force endured by the pile hammer and the pile is reduced, the service life of the pile hammer is prolonged and the pile is protected from being damaged.
Owner:CENT SOUTH UNIV +1

A screw pile driver

The invention relates to a lead screw pile driver. The lead screw pile driver comprises a cylinder pile rack and a pile hammer, wherein a snapping slot which axially extends along the pile rack is formed in the inner wall of the pile rack, a lead screw extending along an axis is assembled on the axis of the pile rack, the lead screw is driven by a motor to rotate, a screw hole matched with the lead screw is formed along an axis of the pile hammer, and a rib matched with the snapping slot in the inner wall of the pile rack is arranged on the outer surface of the pile hammer. Compared with traditional pile drivers, the lead screw pile driver has the advantages that the pile hammer can accomplish high-frequency pile hitting tasks with larger impact forces in smaller strokes, pile hitting speeds are obviously increased, and meanwhile, space of construction areas can be saved.
Owner:SUZHOU SLAITE ELECTRONICS TECH

Three-dimensional movable compacted sand pile forming system in centrifugal test

The invention relates to a three-dimensional movable SCP forming system in a centrifugal test. The system is composed of a sleeve, a piston, sliding wheel assemblies and a hand-powered heavy piling hammer, wherein the sleeve and the piston are needed in the piling process. The sleeve is a hollow cylinder. The piston is a cylindrical rod. The verticality of the sleeve which is clamped in the middle is guaranteed through four sliding wheelslocated on the two sides of the sleeve. Sliding chutes can be connected with a model box used in the test through bolts at the two ends and are fixed above the model box. The hand-powered heavy piling hammer is composed of an upper hand-powered structure and lower guide rails. The upper hand-powered structure can drive the heavy hammer to reciprocate upwards and downwards by shaking a handle of the upper hand-powered structure, so that the heavy hammer strike the top of the piston downwards, and sand is compacted through the piston; meanwhile, a wheel at the top of the upper hand-powered structure is rotated, so that the heavy hammer and a linkage structure of the heavy hammer move upwards and downwards, and the position is adjusted. The lower guide rails comprise two sets of guide rails which are mutually perpendicular on the horizontal plane. The upper hand-powered structure can slide freely in the direction of two guide rails. According to the three-dimensional movable SCP forming system, the SCP forming process can be really simulated in the centrifugal model test; the three-dimensional movable SCP forming system is not only convenient to use and efficient, but also capable of guaranteeing verticality, continuity, compactness and the like of a sand pile, thereby being capable of well providing service for relevant research work.
Owner:TONGJI UNIV +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products