Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Analyzer and a control method for construction cost

A technology of construction engineering and control methods, applied in neural learning methods, instruments, data processing applications, etc., can solve problems such as high manpower and time costs, low gray level detection, and large differences in technical features, and achieve simplified model features The effect of input

Pending Publication Date: 2019-03-26
关玲
View PDF6 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] (1) The cost of existing construction projects is greatly affected by human factors, and the generalization of the rules summarized is poor, and the cost of manpower and time is large, and it is difficult to find hidden rules
[0005] (2) Since there are factors affecting the project cost in the early stages of decision-making, design, bidding, construction, and completion acceptance of the transmission line project, when the analysis of engineering parameters is quite different from the typical scheme, the typical scheme selected subjectively is different from the one to be analyzed The technical characteristics of the project may vary greatly, so the cost analysis based on this will deviate from the actual result. The traditional central control module has a slow calculation speed and the search range of the data is not fine enough.
[0006] (3) The current engineering cost audit method has fewer audit nodes or audit times, it is difficult to guarantee the audit quality, and it is not reliable enough. The brightness uniformity of the display screen currently used is poor, and the gray level detection is low, so it is difficult to realize real people. machine switch
[0007] In the existing technology, the accuracy of the data analysis and processing module to obtain the engineering value is poor

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Analyzer and a control method for construction cost
  • Analyzer and a control method for construction cost
  • Analyzer and a control method for construction cost

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0091] In order to further understand the content, features and effects of the present invention, the following examples are given, and detailed descriptions are given below with reference to the accompanying drawings.

[0092] The structure of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0093] Such as figure 1 As shown, the analyzer for construction project cost provided by the embodiment of the present invention includes: a data acquisition module 1, a data extraction integration module 2, a main control module 3, a cost list classification module 4, a data analysis and processing module 5, and a grid cost analysis module 6. Audit module 7. Data conversion demonstration module 8. Data application sharing module 9.

[0094] The data collection module 1 is connected with the main control module 3, and is used to collect data and materials in the construction decision-making stage, budgetary data and materials in the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of cost analysis of building engineering, Disclosed are an analyzer for construction cost and a control method thereof. The analyzer for construction costcomprises a data acquisition module, a data extraction integration module, a main control module, a cost list classification module, a data analysis and processing module, a power network cost analysis module, an audit module, a data conversion demonstration module and a data application sharing module, wherein, the analyzer comprises a data acquisition module, a data extraction integration module, a main control module, a cost list classification module, a data analysis processing module, a power network cost analysis module, an audit module, a data conversion demonstration module and a dataapplication sharing module. The cost list classification module of the invention is convenient to summarize the existing problems in an all-round way, and prevents frequent changing rules and adding new constraints to the original rules in actual operation, thereby saving time and labor. At the same time, through the cost analysis module of power network to solve the heterogeneity of big data of different business, truly realize the information intercommunication of big data system, comprehensive and efficient operation; In addition, the audit module can ensure the audit quality and reliability by auditing data, auditing and audit results table confirmation and other components of the multi-node multi-dimensional audit process.

Description

technical field [0001] The invention belongs to the technical field of construction engineering cost analysis, and in particular relates to an analyzer and a control method for construction engineering cost. Background technique [0002] Construction engineering refers to the engineering entity formed through the construction of various housing buildings and their ancillary facilities and the installation activities of supporting lines, pipelines and equipment. Among them, "housing construction" refers to projects that have roofs, beams, walls, foundations, and can form internal spaces to meet people's needs for production, living, learning, and public activities. The project cost refers to the construction price of the project, which refers to the sum of all the expected or actual costs required to complete the construction of a project. Defined from the perspective of the owner (investor), the project cost refers to the construction cost of the project, that is, all the f...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/10G06Q50/08G06N3/04G06N3/08G06F16/35G06F16/332
CPCG06N3/084G06Q10/10G06Q50/08G06N3/044Y04S10/50Y02E40/70
Inventor 关玲龚洁
Owner 关玲
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products