A hierarchical scheduling method based on v2g technology load peak period

A technology of layered scheduling and peak period, applied in information technology support systems, instruments, transportation and packaging, etc., can solve problems such as long-term scheduling and poor flexibility, and reduce peak shaving costs, improve reliability, and peak shaving efficiency. more reasonable effect

Active Publication Date: 2022-05-27
SHANGHAI DIANJI UNIV
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The implementation of staggered peak power rationing needs to be arranged a long time in advance, and the flexibility is poor

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A hierarchical scheduling method based on v2g technology load peak period
  • A hierarchical scheduling method based on v2g technology load peak period

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] In order to make the technical means, creative features, achievement goals and effects realized by the present invention easy to understand, the present invention will be further described below with reference to the specific embodiments.

[0034] The invention proposes a four-in-one comprehensive hierarchical scheduling method integrating a power grid load monitoring system, a new energy electric vehicle waste battery energy storage system, electric vehicle operation management, remuneration settlement and evaluation and reward. This method is mainly aimed at units with electric shuttles, electric taxi companies and users of electric private cars. During the peak load period of the power network, it is divided into four layers: waste battery energy storage devices, unit electric shuttles, electric taxis and electric private cars. Carry out peak shaving, make full and reasonable use of various resources, and compensate for the short-term power shortage during the peak lo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a hierarchical scheduling method based on V2G technology during the peak load period, using the respective characteristics of waste battery energy storage devices, unit electric shuttle buses, electric taxis, and electric private cars to guide them to participate in scheduling in four layers during the peak load period discharge. It includes the following steps: recycle waste batteries and assemble them into waste battery energy storage devices; collect data on electric vehicles and grid load gaps; use mobile Internet to transmit the collected information; make strategies to guide discharge for areas where load peaks may occur; The user sends an instruction to guide the energy storage device, unit electric shuttle bus, electric taxi and electric private car to complete the discharge task hierarchically; the owner completes the discharge task according to the guidance and accepts the income settlement and evaluation reward of the intelligent dispatching system. The invention fully and rationally utilizes various resources to compensate short-term power shortage during the peak load period, improves the power supply reliability of the power system, and realizes a win-win situation for electric vehicle owners and power grid companies.

Description

technical field [0001] The invention relates to the fields of new energy electric vehicles and power supply reliability of power grids, in particular to a layered scheduling method based on V2G technology during peak load periods. Background technique [0002] At present, in order to solve the power shortage during the peak load period, one method is to increase the installed capacity, expand the installed capacity of the original power plant by investing in power facilities, and increase the output power during the peak load period; the other method is to adopt an orderly use of power plants. Electricity, according to the output of the power plant, through legal, administrative, economic, technical and other means, strengthen the management of electricity consumption, change the way users consume electricity, and adopt a series of measures such as staggering peaks, avoiding peaks, taking shifts, letting electricity, and negatively controlling electricity rationing. Measures...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): B60L55/00G06Q10/06G06Q30/02G06Q50/06
CPCB60L55/00G06Q10/06312G06Q30/0211G06Q30/0283G06Q50/06Y04S10/50Y04S50/14
Inventor 牛壮壮刘三明刘扬
Owner SHANGHAI DIANJI UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products