Municipal road structure and construction method thereof.
A municipal road and road technology, applied in the field of municipal engineering, can solve the problems of inconvenient pedestrian traffic, poor drainage performance of asphalt layer and anti-skid wear-resistant layer, etc., and achieve the effect of convenient pedestrian traffic, good drainage performance and high construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Such as figure 1 and 2 As shown, a municipal road structure includes a road body 1, and the road body 1 includes a road base 2, a gravel layer 3, an anti-filter geotextile 4, a coarse sand layer 5, and a permeable concrete layer 6 sequentially laid from bottom to top.
[0039]The road base 2 is the foundation of the pavement, which is a geotechnical structure formed by excavation or filling. In this embodiment, the road base 2 is the original soil road bed left after the foundation pit was dug for the original road. Two urban sewer pipes 7 are buried in the road base 2. The urban sewer pipes 7 are made of cement. The urban sewer pipes 7 are arranged along the extension direction of the road. The urban sewer pipes 7 are connected to the urban drainage system. The engineering facility system of urban sewage and rainwater. The urban drainage system is usually composed of several drainage pipes and sewage treatment plants buried under the road surface. Each urban sewer pip...
Embodiment 2
[0051] A construction method for a municipal road structure. The construction method for a municipal road structure provided in this embodiment is applied to a municipal road structure in Embodiment 1. The specific steps of the construction method of the municipal road structure are as follows:
[0052] S1: Excavate the foundation pit, excavate the road base 2 to bury the urban sewer pipe 7 in the road base 2, connect the urban sewer pipe 7 to the urban drainage system, and install a number of prefabricated reservoirs 13 in the city On the sewer pipe 7;
[0053] In this embodiment, the foundation pit dug out is used for paving roads, and the subgrade 2 is the undisturbed soil subgrade that remains after the foundation pit is dug, and the trench for placing the urban sewer pipe 7 is excavated on the subgrade 2. The urban sewer pipe 7 in the trench is connected to the urban drainage system, and then several prefabricated reservoirs 13 are respectively installed at the water inl...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com