A construction method for aerial track change of cable tower climbing formwork
A construction method and a climbing formwork technology are applied in the field of aerial track-change construction of cable tower climbing formwork, which can solve the problems of long construction period and high risk of high-altitude operation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0027] Such as Figure 1-8 , the cable tower 1 of the present embodiment includes four sides, which is a prism structure with a small upper part and a larger lower part. The set of load-bearing frames 4, since the side of the cable tower 1 gradually narrows from bottom to top, the distance between the tracks of the two groups of load-bearing frames 4 located on the outside of the side needs to shrink to adapt to the narrowing of the sides, so when the climbing formwork body 2 travels to the cable tower 1 At a certain height, it is necessary to change the track of the bearing frame 4. The actual track change is to translate the two sets of load-bearing frames 4 on the outer side of the cable tower 1 to the middle, and the load-bearing frame 4 in the middle of the side does not need to change the track.
[0028] When changing the trac...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com