A construction method for aerial track change of cable tower climbing formwork
A construction method and a climbing formwork technology are applied in the field of aerial track-change construction of cable tower climbing formwork, which can solve the problems of long construction period and high risk of high-altitude operation.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2021-07-06
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of bridge construction, in particular to a construction method for cable tower climbing formwork rail change in the air. Background technique
[0002] Climbing formwork is a tower column construction device that uses a climbing system to automatically climb the frame and formwork to the next construction section. Including the overall frame body, the formwork is fixed on the frame body, the frame body is supported on the load-bearing frame, the load-bearing frame is anchored on the concrete that has been poured, and the climbing of the entire climbing formwork is realized through the step-by-step jacking structure. With the development of building structure technology, the pouring of the main structure is becoming more and more complex. For example, in the construction of cable towers, the height of the cable towers and the decorative strips need to be considered during the pouring process of the cable tower...
Examples
Embodiment Construction
[0026] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0027] Such as Figure 1-8 , the cable tower 1 of the present embodiment includes four sides, which is a prism structure with a small upper part and a larger lower part. The set of load-bearing frames 4, since the side of the cable tower 1 gradually narrows from bottom to top, the distance between the tracks of the two groups of load-bearing frames 4 located on the outside of the side needs to shrink to adapt to the narrowing of the sides, so when the climbing formwork body 2 travels to the cable tower 1 At a certain height, it is necessary to change the track of the bearing frame 4. The actual track change is to translate the two sets of load-bearing frames 4 on the outer side of the cable tower 1 to the middle, and the load-bearing frame 4 in the middle of the side does not need to change the track.
[0028] When changing the trac...