The construction method of tunnel vault concrete anti-vacation full-process visualization forward punching
A construction method and concrete technology, which can be used in tunnels, earthwork drilling, tunnel lining and other directions, can solve the problems of unfilled full lining and voids, and achieve the effect of avoiding voids in vault concrete.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] Below by embodiment and in conjunction with accompanying drawing, the present invention will be further described:
[0039] A fully visualized forward-push construction method for concrete void-proofing of a tunnel vault, comprising the following steps:
[0040] Step 1: Use the lining trolley to arrange several pouring holes at intervals along the length direction of the tunnel vault, and each pouring hole is equipped with an anti-vacation positive punching device.
[0041] to combine image 3 — Figure 5 As shown, the anti-vacation forward punching device is mainly composed of a fixed vertical rod 1, a lifting seat 2, a closed gate valve 3 and a conduit 4. The conduit 4 is fixedly installed above the lifting seat 2, and is used for connecting the concrete delivery pump pipe. The closed gate valve 3 is installed on the upper end of the fixed vertical rod 1, and the opening and closing of the closed gate valve 3 is automatically controlled by a horizontal cylinder 5 o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com