Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Cascade hydropower station short-term multi-objective optimization scheduling method considering peak regulation requirements

A technology of multi-objective optimization and dispatching method, which is applied in the field of short-term multi-objective optimal dispatching of cascade hydropower stations, and can solve problems such as insufficient power generation capacity of the power grid, insufficient power grid adjustment capacity, threats to the safe and stable operation of the power grid, etc.

Active Publication Date: 2019-11-19
GUIZHOU QIANYUAN POWER CO LTD +1
View PDF9 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Excessive peak-to-valley gap leads to insufficient power generation capacity of the power grid during peak hours, and part of the load needs to be disconnected from the power grid; at the same time, it also leads to insufficient down-regulation capacity of the power grid during low load periods, and thermal power units face deep peak regulation, which poses a serious threat To the safe and stable operation of the power grid

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cascade hydropower station short-term multi-objective optimization scheduling method considering peak regulation requirements
  • Cascade hydropower station short-term multi-objective optimization scheduling method considering peak regulation requirements
  • Cascade hydropower station short-term multi-objective optimization scheduling method considering peak regulation requirements

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] Below in conjunction with accompanying drawing and case the present invention will be further described.

[0052] The short-term optimal dispatch of cascade hydropower stations needs to consider comprehensive benefits such as power generation efficiency and income. Facing the coupling relationship between hydraulic power and electric power between power stations, as well as the complex operation requirements of hydraulic power and electric power dispatching, it is a typical multi-objective optimization problem. How to effectively solve, Taking into account both solution efficiency and solution accuracy, obtaining practical hydropower generation and operation plans is the focus and difficulty of current research. The present invention aims to propose a short-term multi-objective optimal dispatching method for cascade hydropower stations considering the demand for peak regulation, which can obtain a Pareto solution set containing multiple non-inferior solutions, and provid...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the field of hydropower dispatching operation, and relates to a cascade hydropower station short-term multi-objective optimization dispatching method considering peak regulation requirements. The peak load of a power grid is adjusted. The hydroelectric power generation efficiency is improved. The complex operation requirements of the cascade hydropower station and the unitvibration area constraints are considered. A cascade hydropower station multi-objective short-term optimization scheduling model is constructed by using mixed integer nonlinear programming. The modelis solved by using an improved normalization method plane constraint method to obtain a Pareto solution set containing a plurality of non-inferior solution schemes so as to provide powerful support for final decision making of scheduling personnel. In addition, a membership degree value calculation method based on fuzzy evaluation is used for evaluating each solution in the solution set, and a decision suggestion scheme is selected for reference of scheduling personnel. Starting from the actual situation of hydropower short-term optimal scheduling, complex power generation operation constraints of the power station are comprehensively considered, comprehensive operation benefits of multiple aspects are considered, and the complex scheduling operation requirements of cascade hydropower stations are met.

Description

technical field [0001] The invention belongs to the field of hydropower dispatching operation, and in particular relates to a short-term multi-objective optimal dispatching method for cascade hydropower stations considering the demand for peak regulation. Background technique [0002] With the continuous rapid development of the economic level, the energy consumption structure has undergone tremendous changes, resulting in a continuous increase in social power demand, and at the same time, the gap between the daily maximum load and minimum load of the power grid is also increasing sharply. Excessive peak-to-valley gap leads to insufficient power generation capacity of the power grid during peak hours, and part of the load needs to be disconnected from the power grid; at the same time, it also leads to insufficient down-regulation capacity of the power grid during low load periods, and thermal power units face deep peak regulation, which poses a serious threat To the safe and...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/06G06F17/15
CPCG06Q10/06312G06Q10/06315G06Q50/06G06F17/15Y04S10/50
Inventor 杨焱程春田李泽宏卢玉强周凌安楼楠廖胜利张旭武新宇夏安宇王荣欣张超肖鹏
Owner GUIZHOU QIANYUAN POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products