Calculation method for pre-stressed anchor cable embedded pile

A technology of prestressed anchor cables and calculation methods, applied in sheet pile walls, geometric CAD, construction, etc., can solve problems such as the risk of soil overtop, achieve the effects of reducing the internal force of the pile body, reducing the cost, and changing the pile length

Active Publication Date: 2020-01-10
HENAN UNIVERSITY
View PDF11 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] For the shortcomings in the above-mentioned background technology, the present invention proposes a calculation method for embedded piles with prestressed anchor cables. According to the Mohr-Coulomb failure criterion of soil and the limit equilibrium method, the calculation complexity is reduced, and the problems of buried piles in the prior art are solved. Technical Problems of the Risk of Exceeding Soil on Top of Pile Piles

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Calculation method for pre-stressed anchor cable embedded pile
  • Calculation method for pre-stressed anchor cable embedded pile
  • Calculation method for pre-stressed anchor cable embedded pile

Examples

Experimental program
Comparison scheme
Effect test

specific example

[0059] As a specific example, the basic characteristics and basic control measures of the 1# landslide at the Friendship Bridge in Zhangmu Port, Tibet:

[0060] Friendship Bridge 1# landslide is located under the peak of Zamarigang Mountain in the southwest of Zhangmu Port in Tibet Autonomous Region, on the left bank of the lower reaches of Boqu River, and on the mountain side of Sherpa Street. The terrain has large undulations, high mountains, and steep slopes. Judging from the topography, the terrain where the landslide is located is concave, with a clear perimeter, and the overall landslide is in the shape of a "tongue". The shear outlet of the front edge of the landslide is located near the riverbed of the Boqu River, with an elevation of 1840-1900m. The elevation of the trailing edge is 2350-2360m from the trailing edge to the steep and gentle terrain change area in the middle and upper part of the slope. The maximum height difference between the front and rear edges of th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a calculation method for a pre-stressed anchor cable embedded pile. The method comprises the steps of firstly, regarding the embedded pile and an anchor cable as a whole, then establishing a passive earth pressure fracture surface balance equation and a pile top surface balance equation according to the passive earth pressure fracture surface sliding and the pile top surfacesliding existing in a soil body behind the pile, and calculating the length of the embedded pile above a sliding surface; and finally, calculating the maximum shearing force and the maximum bending moment of the embedded pile under the action of landslide thrust. The method is based on a soil body molar coulombic failure criterion and a limit equilibrium method, reduces the calculation complexityof the pre-stressed anchor cable embedded pile, changes the pile length of a loaded section and reduces the internal force of a pile body, the pre-stressed anchor cable embedded pile can bear the larger thrust like an anchor cable common pile, but also the pile body materials can be saved, the manufacturing cost is reduced, and the reference is provided for the extra-large landslide disaster treatment in the important engineering construction in China.

Description

technical field [0001] The invention relates to the technical field of embedded piles, in particular to a calculation method for embedded piles with prestressed anchor cables. Background technique [0002] The retaining structure is an important measure often used in the prevention and control of landslides, and plays a decisive role in the safety of engineering construction. The retaining wall is the earliest retaining structure used in landslide prevention and control. The retaining wall mainly relies on its own gravity and the friction of the wall bottom to bear the thrust of the landslide, generally within 1000KN; The anchoring effect in the stable stratum is used to balance the thrust of the landslide. The greater the thrust, the larger the design of the pile section and the longer the anchorage section. The thrust of the landslide is generally within 2000KN; the prestressed anchor cable anti-slide pile was applied in the 1980s The most common form of the developed ant...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13E02D5/76
CPCE02D5/76
Inventor 王浩岳建伟张建伟吕芝莹汪鹏
Owner HENAN UNIVERSITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products