Concrete chute pouring system and construction method for the second lining of the tunnel
A concrete and tunnel technology, applied in the field of concrete pouring, can solve the problems of time delay, grout leakage and other problems, and achieve the effect of improving quality, preventing grout leakage, and reducing pipe replacement procedures
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039]The present invention will be further described below in conjunction with the examples. The description of the following examples is provided only to aid the understanding of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.
[0040] The concrete chute pouring system for the second lining of the tunnel includes a concrete chute system for the second lining of the tunnel, a fast closing structure for the pouring window of the lining formwork, and a multi-layer synchronous vibrating device for the second lining concrete of the tunnel.
[0041] The tunnel secondary lining concrete chute system includes a main hopper 1, a main chute 2, a distribution hopper 3, an insert plate 4, a telescopic...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com