Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction method of excavated roadbed of high-speed railway in deep artificial spoil area

A technology of high-speed railway and construction method, which is applied in the directions of excavation, soil protection, on-site foundation soil survey, etc. It can solve the problems of low foundation bearing capacity, short genesis time, loose soil, etc., to reduce disturbance and reduce additional stress , The effect of ensuring comfort

Inactive Publication Date: 2020-06-30
CHINA RAILWAY LIUYUAN GRP CO LTD
View PDF8 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The artificial spoil has a short time of formation, and has not been compacted. It has the physical characteristics of large porosity, loose soil, and low foundation bearing capacity. The general and single foundation reinforcement measures cannot meet the relevant requirements of the code.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of excavated roadbed of high-speed railway in deep artificial spoil area

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0055] The embodiment of the invention discloses a construction method for excavating subgrades of high-speed railways in deep artificial spoil areas, such as figure 1 shown, including the following steps:

[0056] In step A, subgrade construction (leveling construction) is carried out on the original ground, and the construction is carried out under the construction conditions of three links and one leveling.

[0057] Specifically, in step A, the "three connections and one leveling" work should be done before construction to ensure that the construction site is watered, powered, and the pathway and site are leveled, and that construction personnel and machines can enter the site normally. Prepare adequately for construction. Be...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Viscosityaaaaaaaaaa
Login to View More

Abstract

The invention discloses a construction method of an excavated roadbed of a high-speed railway in a deep artificial spoil area. The method is characterized by comprising the following steps: step A, leveling the land of a site; step B, excavating artificial spoil in a layered mode, and carrying out slope brushing; step C, carrying out dynamic compaction on a cutting foundation base; step D, constructing a slope surface protection project of the arched framework of the cut slope; step E, constructing a cast-in-situ bored pile; step F, constructing a cast-in-situ bored pile top joist; step G, filling roadbed foundation bed filler; and step H, carrying out construction of affiliated structures of the cutting section. The construction method has the beneficial effects that the construction quality of the excavated roadbed in the deep artificial spoil area can be ensured, the stability of the side slope and the foundation of the artificial spoil cutting roadbed is ensured, the post-construction settlement of the foundation can be effectively controlled, the reliability of roadbed filling construction is ensured, and no disease is generated in the subsequent operation of the roadbed.

Description

technical field [0001] The invention belongs to the technical field of foundation reinforcement for special unfavorable geological conditions of railways, and in particular relates to a construction method for digging subgrades of high-speed railways in deep artificial spoil areas. Background technique [0002] High-speed railway is the precious crystallization of human civilization and wisdom, and an important symbol and strong support for the modernization of human society. At present, China's high-speed railway has established a relatively complete operation and management system, which has ensured the continuous safety of operation, achieved good business performance, provided safe, fast, comfortable and economical transportation services, and effectively promoted the sound and fast economic and social development. develop. After the opening of the high-speed railway, the freight capacity of the existing railway corridor has been greatly released, laying a solid foundat...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01B2/00E01B1/00E02D27/14E02D17/02E02D17/04E02D3/046E02D17/20E02D5/38E02D1/08
CPCE01B2/006E01B1/008E02D27/14E02D17/02E02D17/04E02D3/046E02D17/20E02D5/385E02D1/08E02D2300/002E01B2204/08
Inventor 周凯张旭张翔王飞牛凤鸣孟庆文欧成章马文军于东彬范俊怀石晓旺邱磊聂廷立马欢雄
Owner CHINA RAILWAY LIUYUAN GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products