35 results about "Dirt road" patented technology

A dirt road or track is a type of unpaved road made from the native material of the land surface through which it passes, known to highway engineers as subgrade material. Dirt roads are suitable for vehicles; a narrower path for pedestrians, animals, and possibly small vehicles would be called a dirt track—the distinction is not well-defined. Unpaved roads with a harder surface made by the addition of material such as gravel and aggregate (stones), might be referred to as dirt roads in common usage but are distinguished as improved roads by highway engineers. (Improved unpaved roads include gravel roads, laterite roads, murram roads and macadamized roads.)

Road slope earth shoulder drainage system

The utility model discloses a road slope earth shoulder drainage system which comprises a water outlet piece, an earth shoulder vertical curb water blocking belt, a transverse drainage pipe assembly, a longitudinal drainage pipe and a base. The water outlet piece and the earth shoulder vertical curb water blocking belt are arranged on the edge of a highway pavement and used for collecting water in a centralized mode. The base is embedded in a side slope; the longitudinal drainage pipe is arranged on the base, and the longitudinal drainage pipe is longitudinally arranged in the advancing direction of a road; one end of the transverse drainage pipe assembly is connected with the water outlet piece and the earth shoulder vertical curb water blocking belt, and the other end of the transverse drainage pipe assembly is connected with the longitudinal drainage pipe. The longitudinal drainage pipe is provided with a plurality of sections, and the plurality of sections of the longitudinal drainage pipe are communicated with one another and finally communicated to a rain sewage outlet point. The drainage ditch is suitable for the conditions that drainage of a highway embankment drainage ditch arranged by utilizing gravity flow is unsmooth, natural water systems on the ground surface are deficient or land use is limited and the like; according to the utility model, fewer water outlet points of a natural water system can be reasonably utilized to form a complete drainage system.
Owner:HARBOUR ENG DESIGNING INST CO LTD CCCC FOURTH HARBOR ENG G

Geogrid and EICP synergistically reinforced soil embankment structure and construction method

The invention discloses a geogrid and EICP synergistically reinforced soil embankment structure and a construction method, and relates to the technical field of soil embankment structures. Comprising a pavement base layer, an embankment bearing layer and a natural soil foundation layer, and the natural soil foundation layer is used as a soil embankment structure support and is arranged at the bottommost layer; the pavement base layer is used for bearing an upper driving load and uniformly transferring the upper driving load to the embankment bearing layer below; and the embankment bearing layer is used for bearing the upper load transmitted by the pavement base layer. The engineering performance is improved through the multi-layer synergistic effect, the core reinforcing layer is of an innovative space grid structure and is composed of a prefabricated geogrid, a grid support arranged in the inclined direction and a rigid stress plate frame, a three-dimensional force transmission network is formed, the limitation of a traditional reinforcing method is broken through, and the engineering performance is improved. In addition, the grating support is arranged at a specific angle, the structural rigidity is guaranteed, and the stress concentration phenomenon is avoided.
Owner:HUNAN INSTITUTE OF ENGINEERING

Half-range alternate passage road-to-bridge structure for reconstruction and extension of road

The utility model relates to a half-range alternate passage road-to-bridge structure for reconstruction and extension of a road. Comprising a double-steel-casing combined structure, an anchor cable reverse light soil embankment steel sheet pile protection structure used for half-range vertical excavation protection construction of the original road surface soil layer road-to-bridge change after bridge excavation, and a light soil embankment opposite-pull anchor cable steel sheet supporting structure used for slope protection construction of the original road surface soil layer road-to-bridge change after bridge excavation. The light soil embankment steel sheet pile protection structure has the advantages that the anchor cables are adopted for reversely building the light soil embankment steel sheet pile protection structure, a building envelope is formed through the steel sheet piles, extra supporting force is provided in combination with the anchor cables, and the stability of a foundation pit is effectively guaranteed; the light soil embankment opposite-pull anchor cable steel plate supporting structure is adopted, and the stability and the bearing capacity of a supporting system are effectively improved; the opposite-pulling anchor cables are arranged in the light soil embankment and are connected with the steel plates to form an integral stress structure, so that the soil body pressure is effectively dispersed, and the burden of the self weight of the embankment on a foundation is reduced.
Owner:HUBEI ROAD & BRIDGE GRP CO LTD

Highway engineering slope protection device

ActiveCN224199918UBlock slidingblock flowExcavationsAgricultural engineeringStructural engineering
The highway engineering slope protection device comprises a connecting plate, through holes are formed in the two sides of the connecting plate, the highway engineering slope protection device further comprises two expansion frames, an adjusting and limiting assembly, a protection net and a positioning assembly, the two expansion frames are hinged to the bottom of the side wall of the connecting plate, and the protection net is movably connected to the inner sides of the expansion frames through the adjusting and limiting assembly; the adjusting limiting assembly is slidably arranged on the outer wall of the expanding frame, and the positioning assembly penetrates through the connecting plate to be movably connected to the middle of the connecting plate and used for fixing the position of the connecting plate and adjusting the angle of the symmetrical expanding frame. The utility model belongs to the technical field of slope protection devices, and particularly relates to a highway engineering slope protection device which aims at water and soil conservation of soil shoulders on the two sides of a highway, improves the covering quality of a vegetation net and prevents gravel from rolling.
Owner:GANSU XINLU TRAFFIC ENG CO

Railway special line intelligent inspection robot system and multi-mode sensing method thereof

The invention discloses a railway special line intelligent inspection robot system and a multi-mode sensing method thereof, and the system comprises a crawler-type mobile platform which is used for autonomously moving on a railway track and under complex road conditions along the line; the multi-mode sensing module is installed on the crawler-type mobile platform and used for collecting multi-source heterogeneous data of the railway infrastructure and the environment, therefore, the multi-mode sensing module is adopted, full-dimension recognition is achieved, the missing detection rate and the false detection rate are greatly reduced, the crawler-type mobile platform is adopted, the crawler-type structure is high in road holding force, the anti-interference capacity is outstanding, and the reliability of the system is improved. The robot can flexibly adapt to scene seamless switching of a track, a soil road along the line and a ramp, can complete operations such as close-range review and slight disposal of hidden dangers through the mechanical arm, makes up for the defect that existing equipment has no execution capability, does not need manual intervention into a closed loop, and greatly improves the inspection and disposal efficiency.
Owner:张琨

Landscape guardrail and installation method

The invention relates to the technical field of landscape guardrails, in particular to a landscape guardrail installation method.The landscape guardrail comprises a guardrail body, the guardrail body comprises a stand column, a cross beam connected to one side of the stand column, a first connecting piece connected between the stand column and the cross beam and a second connecting piece connected between the stand column and the ground; the stand column is provided with a connecting section and a bent section connected to the lower side of the connecting section, the first connecting piece is connected to the connecting section, the second connecting piece is connected to the bent section, the bent section is located between the cross beam and the ground, and the bent section is bent towards the side away from the cross beam. Through the arrangement of the bent sections of the stand columns, the lower foundations of the stand columns deviate towards the roadside, on the premise that the overall protection capacity of the guardrail and the thickness of a protection layer on the outer sides of the stand columns are guaranteed, the occupation of the guardrail on the road surface and the earth shoulder width is reduced, the construction cost of road surface buildings is reduced, and the stand columns are suitable for road sections with limited construction spaces such as the near water and the near cliff.
Owner:SHENZHEN SUREWAY TRAFFIC INDAL

Method and device for anticipatory all-wheel and four-wheel drive activation

Method for predicting and activating AWD on a route, where a process - Receives weather data (401) and uses this data to determine whether AWD and / or 4WD should be automatically activated or deactivated, and at the - any areas on the route corresponding to gravel, dirt or otherwise unpaved roads are considered first (403), with a flag being set (405) for each of these areas, and - wherein a predetermined distance or time before reaching these areas the process activates AWD, wherein the process also checks whether any weather warnings indicating possible upcoming weather over regions of the route exist for the time the vehicle is predicted to travel (407), wherein the process sets a flag for AWD or 4WD for these areas (409) if there are any weather warnings for any regions of the route, and wherein if and when the vehicle encounters an area with a flag set (411), the process checks whether a timestamp is associated with the area (413), and if there is no timestamp, activates AWD (417) shortly before the vehicle enters the area with a flag set, or wherein alternatively, a point on the route is set at which AWD is to be activated and another point at which AWD is to be deactivated.
Owner:FORD GLOBAL TECH LLC

Sidewalk paving structure

The utility model relates to a sidewalk paving structure which comprises a plain soil roadbed layer, a broken stone hardcore, a concrete layer and a mortar leveling layer which are sequentially arranged from bottom to top, long-strip-shaped bases are arranged on the upper side of the mortar leveling layer side by side, and clamping grooves are formed in the two sides of the upper end face of each long-strip-shaped base in the length direction of the long-strip-shaped base. A row of floor tiles are laid on the upper side of the connecting position of every two adjacent long-strip-shaped bases in the length direction of the long-strip-shaped bases, protrusions are arranged at the positions, corresponding to the clamping grooves, of the two ends of the lower end faces of the floor tiles and clamped in the clamping grooves, gaps are reserved between every two adjacent rows of floor tiles, and drainage grooves are formed in the two ends of the long-strip-shaped bases. The drainage groove is perpendicular to the long-strip-shaped base and lower than the upper end face of the long-strip-shaped base, drainage pipes are arranged at the bottom of the drainage groove at intervals, the drainage pipes are communicated with a municipal rainwater pipeline, and damage of rainwater to the mortar leveling layer can be reduced.
Owner:TONGXIANG MUNICIPAL CONSTR ENG CO LTD

Dumper unloading paver hopper for earth shoulder paving

The invention relates to the technical field of road construction, in particular to a dump truck unloading paver hopper for earth shoulder paving, which comprises a main frame and a conveying belt mechanism mounted at the lower end of the main frame, an upper unloading bin is movably assembled on the upper surface of the main frame through an overhead adjusting disc, and an electric control type unloading hopper is mounted at a lateral opening of the upper unloading bin. And an electric control type paving mechanism is arranged at the position of a discharge port of the electric control type discharge hopper. According to the unloading paver hopper of the dumper for paving the earth shoulder, the electric control type unloading hopper is installed at the lateral opening position of the upper unloading bin, the side hanging type lifting adjusting mechanism is used for driving the electric control type unloading hopper to ascend and descend, the unloading paver hopper can adapt to different paving heights, and the application range is wider; the electric control type discharge hopper is composed of the lifting hopper and the extension hopper which is slidably controlled through the telescopic supporting rod, so that the paving and discharging width of the electric control type discharge hopper can be freely changed, and the operable range is more diversified.
Owner:GUANGDONG GUANYUE HIGHWAY & BRIDGE

Multi-task sensing method and device for cross-country pavement

The invention provides a multi-task perception method and device for a cross-country pavement, and the method comprises the steps: carrying out the processing of an RGB image through a detail extraction model, and obtaining low-dimensional detail features; processing the RGB image by using the semantic extraction model to obtain a high-dimensional semantic feature; processing the point cloud data by using a Point Pillars network to obtain elevation features; fusing the low-dimensional detail features, the high-dimensional semantic features, the elevation features and the IMU features by using a fusion model to obtain fused features; encoding the fusion features by using a shared encoder to obtain general features; processing the general features by using a pavement classification decoder to obtain a pavement classification result; processing the general features by using a pavement segmentation decoder to obtain a pavement segmentation result; and processing the general features by using a pavement roughness quantization decoder to obtain a pavement roughness quantization result. According to the method, precise classification of typical off-road pavements such as earth roads, grass roads and gravel roads can be realized.
Owner:BEIJING UNIV OF CHEM TECH

Prestressed reinforced soil embankment retaining structure

The utility model relates to the technical field of road construction, and discloses a prestressed reinforced soil embankment retaining structure, which is characterized in that a plurality of geotechnical bag layers of a geotechnical bag retaining body are stacked on a wall foundation and are positioned on the outer side of a reverse osmosis layer; the reinforced net reversely wraps the plurality of geotechnical bag layers and extends into the embankment core; the cast-in-place outer wall face is arranged on the wall face foundation and located on the outer side of the geotechnical bag blocking body. One end of each lacing wire net is arranged in the dike core, and the other end of each lacing wire net is connected with reinforcing bars of the cast-in-place outer wall surface; one end of each prestressed rib net is connected with a pressure plate, the other end of each prestressed rib net is connected with the outer side face of the cast-in-place outer wall face through an anchor head, the prestressed rib net located on the left side of the dike core is connected with the pressure plate located on the right side of the dike core, and the prestressed rib net located on the right side of the dike core is connected with the pressure plate located on the left side of the dike core. The embankment retaining structure and the embankment core are constructed at the same time, and the advantages that the embankment can be rapidly filled, filler is fully compacted, the left and right distribution pressure plates apply pressure oppositely, the ultimate pulling resistance is high, and the overall stability is high can be achieved.
Owner:CHINA RAILWAY NO 5 ENGINEERING GROUP CO LTD +1

Construction, operation and maintenance road for desert photovoltaic power station

The utility model discloses a construction, operation and maintenance road for a desert photovoltaic power station in the technical field of road construction, which comprises a geocell, a red clay layer and a thick mud gravel surface layer which are sequentially arranged on a sand roadbed from bottom to top, the geocell is filled with fine gravels, earth shoulders are arranged on the red clay layer along two sides of the road, and the thick mud gravel surface layer is arranged on the red clay layer along two sides of the road. A groove-shaped space formed by the earth shoulder and the red clay layer is filled with the thick mud gravel surface layer. The earthwork standard room is used as a middle roadbed body, the structural strength of the roadbed can be improved, the effect of stabilizing the bottom sand roadbed is achieved, the earthwork standard room and the thick mud gravel surface layer are connected through the red clay layer, red clay has high viscosity, the roadbed strength is improved after the red clay is combined with sandy soil, the load of the road surface layer is evenly transmitted to the roadbed, and the roadbed structure is stable. The pavement cracking condition is reduced; most materials of the whole road are obtained locally, construction and operation and maintenance requirements of desert photovoltaic power stations are met, cost is low, and ecological environmental protection is facilitated.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

Road for whole vehicle reinforced corrosion test

The invention discloses a road for a whole vehicle reinforced corrosion test, which relates to the technical field of test roads, and comprises a mud road, which has a certain radian and a fan-shaped circle center formed by the radian; the gravel road and the slurry road are located in the same sector circle center and located on the inner side of the slurry road, so that a pavement structure with the arc length smaller than that of the slurry road is formed; the semi-closed dust hole is formed between the gravel road and the fan-shaped circle center, so that the semi-closed dust hole is combined with the slurry road and the gravel road side by side; and the acid soil is laid on the dust hole and the slurry road. The dust hole is semi-closed and contains specific component acid soil, and the driving scene of automobiles on earth roads in the European market is simulated. And meanwhile, the semi-closed dust hole is arranged, so that the influence of the external environment on the test sample vehicle during the test is avoided, and the test quality is improved. The gravel road and the slurry road with radians fill up the problem that the impact influence of gravel and slurry on the area below the vehicle body when the vehicle turns cannot be simulated by the previous linear road surface design, and the corrosion assessment is more comprehensive.
Owner:HAINAN TROPICAL AUTOMOBILE TEST CO LTD

Bridge and culvert height-limiting protective frame structure suitable for earth road and sandstone road

The utility model discloses a bridge and culvert height-limiting protective frame structure suitable for earth roads and sandstone roads, which relates to the technical field of bridge and culvert height-limiting protective frames and comprises a pair of seamless steel tube stand columns and a height-limiting cross beam positioned at the upper ends of the seamless steel tube stand columns. The upper ends of the seamless steel pipe stand columns are connected with the height limiting cross beam through flanges, the lower ends of the seamless steel pipe stand columns are connected with foundations through flanges, and a ground beam is arranged between the foundations. In work points such as a soil road and a sand stone road, the ground beam can enlarge the foundation bottom area, reduce the foundation pressure of unit area and prevent overlarge local settlement, the ground beam is of a reinforced concrete structure, the clear height from the height limiting cross beam to the road surface can be effectively controlled, the risk that bridges and culverts are collided by vehicles is avoided, and safety is improved.
Owner:RAILWAY DESIGNING INST

A leveling device for saline soil roadbed construction

The utility model discloses a kind of levelling devices for salinized soil roadbed construction, belong to roadbed construction technical field, including first mounting bracket, the first mounting bracket top end is fixedly connected with support plate, the support plate bottom end is equipped with scraping assembly, the first mounting bracket one end is fixedly connected with rolling assembly;In the utility model, by being provided with push plate in, when being constructed, can be moved by rotating threaded rod and drive mounting plate and drive push plate to move downwards, to be able to push the excessively high soil heap by push plate when moving, by this design, when the soil road is leveled, the soil after rotary tillage can be flattened by push plate, so that the balance of pressure wheel is affected, while when being compacted by pressure wheel, the surface of pressure wheel can be wiped by scraper to avoid more soil being adhered to the surface of pressure wheel.
Owner:HUBEI ROAD & BRIDGE GRP CO LTD +3

A soil embankment structure and construction method for synergistic reinforcement of geogrid and EICP

This invention discloses an embankment structure and construction method reinforced by geogrid and EICP, belonging to the field of embankment structure technology. It includes: a road base course, an embankment bearing layer, and a natural soil foundation layer. The natural soil foundation layer serves as the structural support for the embankment and is located at the bottom layer. The road base course bears the upper traffic load and evenly transfers it to the lower embankment bearing layer. The embankment bearing layer bears the upper load transferred from the road base course. This invention improves engineering performance through multi-layered synergistic effects. The core reinforcement layer adopts an innovative spatial grid structure, composed of prefabricated geogrids, obliquely arranged geogrid supports, and rigid load-bearing plates, forming a three-dimensional force transmission network. This overcomes the limitations of traditional reinforcement methods, achieving multi-directional load transfer and uniform distribution. Furthermore, the geogrid supports are arranged at a specific angle, ensuring structural rigidity while avoiding stress concentration.
Owner:HUNAN INSTITUTE OF ENGINEERING

A highway soil shoulder slip-form cast-in-place forming device

This invention relates to the field of road shoulder slipforming technology, specifically a slipforming casting device for highway soil shoulders. It includes a top shell with a connecting component fixedly connected to one side for connection to a slipform paver. A mold mechanism is located inside the top shell, comprising two side plates. Multiple guide rails are fixedly connected to the top surface of the top shell, and the tops of both side plates are slidably engaged with these guide rails. In this invention, the road soil is limited by the top shell and mold mechanism, and the road soil is evenly distributed by a dispersing mechanism. The road soil is then vibrated and compacted by the forming mechanism to form a road shoulder. If a defective road shoulder appears, it can be cut and broken by the dispersing mechanism to restore the road shoulder to its original road soil state. The road soil is then pre-compressed by the dispersing mechanism, and then compacted by the forming mechanism, facilitating the reconstruction of the road soil.
Owner:JIANG SU SHENG ZHEN JIANG SHI LU QIAO GONG CHENG ZONG GONG SI +1

Construction method for large-thickness paving of cement-stabilized gravel base

The invention belongs to the technical field of road paving, and particularly discloses a construction method for large-thickness paving of a cement-stabilized gravel base layer, which comprises the following steps: screening a gravel material, controlling the ratio of cement to the gravel material during mixing, controlling the water content to be 4.77%, adding water according to the environment temperature, controlling the maximum dry density to be 2.365 g / m < 3 >, and constructing an earth shoulder during paving. Controlling the thickness and the speed of virtual paving by paving, rolling by using road rollers with different tonnages, finishing the surface until no wheel mark exists after initial pressing, re-pressing and final pressing, then performing depth detection, and finally performing film covering and watering maintenance; by strictly controlling the content of raw materials and cement, the water content, the maximum dry density, the paving thickness and grinding, shrinkage cracks caused by sudden change of water gradient are reduced, so that the problems that the water evaporation speed of the raw materials of the cement-stabilized base layer in an arid climate region is too high in the subsequent construction stage, the shrinkage cracks appear on the cement-stabilized base layer, and the construction quality is influenced are solved. Therefore, the strength is reduced.
Owner:XINJIANG BEIXIN GEOTECHNICAL ENG SURVEY & DESIGN CO LTD +1

A compact tunnel inner profile design method based on full shoulder width of highway

The present application relates to a kind of compact tunnel inner profile design method based on highway full shoulder width, belong to underground engineering technical field.The method by collecting the basic information of the road section where tunnel is located, the highway clearance of the road section where tunnel is located and the additional clearance of soil shoulder width are drafted, and jointly constitute tunnel building clearance;From the top edge and top corner edge of highway clearance, top positioning base point is established, and top part of tunnel inner profile is drafted according to 5 base points+7 control points+3 arc segment method;From the bottom edge of tunnel building clearance, bottom positioning base point is established, and bottom part of tunnel inner profile is drafted according to 5 base points+7 control points+3 arc segment method;From the bottom edge of tunnel building clearance, bottom positioning base point is established, and two side walls of tunnel inner profile are drafted according to 2 base points+6 control points+4 straight line segment method;Top part, bottom part and two side walls of inner profile are combined to constitute complete tunnel inner profile.The present application can not only truly meet the requirement that tunnel should be same width with roadbed, but also avoid tunnel section space waste, with strong economy, practicality and application significance.
Owner:YUNNAN TRAFFIC PLANNING DESIGN RESEARCH INSTITUTE CO LTD

Construction method of road reconstruction and expansion half-alternate traffic road to bridge structure

This invention relates to a construction method for converting a half-width alternating traffic road into a bridge structure in highway reconstruction and expansion, including two construction methods: bridge-before-excavation and excavation-before-bridge. The beneficial effects of this invention are: It employs a lightweight earth embankment with sheet pile protection structure using anchor cables, forming a retaining structure through the sheet piles and providing additional support through anchor cables, effectively ensuring the stability of the foundation pit. During construction, the reverse construction method is used to gradually excavate downwards, reducing the risk of collapse and deformation. Simultaneously, the half-width vertical excavation method reduces the impact on the surrounding environment and traffic, making it suitable for construction scenarios in confined spaces such as underground engineering, tunnels, and subway foundation pits. It has advantages such as high construction flexibility, strong safety, and high efficiency. Before bridge construction, the pre-drilled pile foundation is constructed using a double steel casing combination structure, ensuring the stability and bearing capacity of the roadbed and pile foundation, and reducing the disturbance of the completed structure to subsequent excavation.
Owner:HUBEI ROAD & BRIDGE GRP CO LTD

A new farmland road structure and soil solidification method

The application provides a novel farmland road structure, which is paved on farmland base soil and comprises, from bottom to top, a mesh cloth layer, a water guide grid layer, a sand cushion layer and a solidified soil layer. The mesh cloth layer is covered on the farmland base soil, the water guide grid layer is covered on the mesh cloth layer and comprises an HDPE three-dimensional honeycomb grid, the height of the HDPE three-dimensional honeycomb grid is set as 150±50 mm, the sand cushion layer is filled in the HDPE three-dimensional honeycomb grid, the sand cushion layer is composed of medium coarse sand and / or gravel, and the solidified soil layer is covered on the sand cushion layer. The three-dimensional composite framework structure composed of the water guide grid layer and the sand cushion layer effectively disperses the upper vehicle load to a larger area of the base layer, greatly improves the overall rigidity and anti-deformation capacity of the road, effectively avoids the rut and subsidence problems of the traditional soil road under the rolling of heavy agricultural machinery, and the overlying solidified soil layer further provides a solid and flat driving surface.
Owner:SHANGHAI HUASONG ENTERPRISE MANAGEMENT CONSULTING CO LTD

Earthing stick device using spring wire cable

The present specification discloses an earthing stick device which enables earthing with a palm by using a stick used for dirt roads or hiking. The earthing stick device according to the present specification comprises: a ground contact part positioned at one end and made of a conductive material; a ground handle part located at the other end, including a hollow therein, and made of a conductive material; a plurality of connection sticks located between the ground contact part and the ground handle part, and including a hollow therein; and a ground connection line part located inside the ground handle part and the plurality of connection sticks, and having one end electrically connected to the ground contact part and the other end electrically connected to the ground handle part, wherein at least a portion of the ground connection line part may be formed in a spring structure.
Owner:KIM DONGJOO

Novel highway embankment widening structure

A novel highway embankment widening structure is characterized in that an L-shaped check block (2) is arranged on one side or two sides of an old road shoulder before transformation, the L-shaped check block (2) is of a reinforced concrete structure formed by integrally casting a side wall (201) and a bottom plate (202) in situ, the bottom plate (202) is borne in an old road bed (1), the inner side of the side wall (201) intersects with the narrowest point of an old road surface (3), and the bottom plate (202) is arranged on the side wall (201). A filling space (4) is formed between the inner side surface of the side wall (201) and the innermost side of the bottom plate (202) and between the bottom plate (202) and the surface, not connected with the side wall (201), of the bottom plate (202), the filling space (4) is filled with a filling material matched with the material of the old road surface (3). Due to the arrangement of the L-shaped check block, the whole device can be used for binding steel bars and concrete on site, the construction is convenient and simple, and the construction speed is high.
Owner:JSTI GRP CO LTD

A lime-soil subgrade spreading device for roads

The utility model relates to lime roadbed technology field especially a lime soil roadbed cloth ash device for road, the utility model's advantage lies in: through the vibration of two vibrating plates, can add the vibration to the lime inside cloth ash box body, can make the lime more quickly drop to supplement the part of ash box body, makes the lime heap more compact that constitutes, prevents the appearance interval, simultaneously the vibration of two vibrating plates drives the high -frequency vibration of top several vibrating tooth plates again, makes the lime that adds is broken by vibration, prevents its part that unites falls, makes it get broken, makes the material heap that lime constitutes more delicate, improves the evenness of distribution, through the upper guide plate of two flow guides and guides, makes the lime more quickly, fully gathers to the center, improves cloth ash efficiency, simultaneously unceasing vibration makes the lower guide plate reciprocating vibration to the middle, makes the lime heap more compact that constitutes, improves cloth ash measurement accuracy, lime soil ash dose reaches the design requirement.
Owner:HEBEI ROAD & BRIDGE GROUP

Supporting and retaining framework for heightening earth shoulder of road and integrated structure provided with guardrail

The utility model relates to the technical field of roads and construction, in particular to a retaining framework for heightening a road shoulder and an integrated structure provided with guardrails, which comprises a plurality of first hollow steel pipes and first reinforced concrete stop dogs, two adjacent first hollow steel pipes are driven into a roadbed according to a first preset distance, and the first reinforced concrete stop dogs are driven into the roadbed according to a second preset distance. The length driven into the roadbed is greater than or equal to a first preset value; the length of the first hollow steel pipe not driven into the roadbed is greater than or equal to a second preset value; and reinforced concrete is poured on the periphery of the first hollow steel pipe and the preset position of the roadbed, so that a first reinforced concrete stop block is formed. The utility model has the advantages that: through the first hollow steel pipe and the cast-in-place first reinforced concrete stop block, the device is durable and convenient to construct. And the cast-in-place first reinforced concrete supporting stop blocks are connected with the existing roadbed into a whole through the hollow steel pipes, so that the integrity is good, and the stability and durability of the earth shoulder are improved.
Owner:JILIN HIGHROAD RECONNAISSANCE DESIGN INST +1

A soil shoulder leveling device

ActiveCN224325652URoads maintainenceRoad surfaceEarth materials
The utility model discloses a kind of earth road shoulder leveling devices, it is related to earth road shoulder leveling equipment technical field, including scraping flat plate group, the scraping flat plate group is installed on connecting frame, the connecting frame is installed on the mechanical arm of walking machine, the lower edge of the scraping flat plate group is used to scrape flat earth road shoulder surface, one side of the scraping flat plate group is equipped with first calibration support, first calibration rod is connected on the first calibration support, the first calibration rod can be moved up and down on the first calibration support, the lower end of the first calibration rod can be contacted with road surface. The utility model is contacted with road surface by first calibration rod, so that the height of scraping plate group can be calibrated, so that it can be scraped flat along the expected height to the earth material on earth road shoulder surface.
Owner:ROAD & BRIDGE INT CO LTD +1

Soft soil roadbed drainage structure

The utility model discloses a soft soil roadbed drainage structure, and particularly relates to the technical field of road engineering, which comprises a soft soil roadbed base body, and further comprises a trapezoidal engineering gravel layer and a tamped clay layer which are sequentially arranged above the soft soil roadbed base body along the vertical direction, anti-seepage geotechnical cloth is paved on the tamped clay layer, a fine sand layer is paved on the anti-seepage geotechnical cloth, and a waterproof layer is paved on the fine sand layer. A first gravel layer is laid on the fine sand layer, and a permeable asphalt layer is laid on the first gravel layer. According to the drainage structure provided by the utility model, the supporting strength of a road is improved by utilizing a trapezoid formed by the engineering gravel layer and the tamped clay layer, and meanwhile, the anti-seepage geotechnical cloth has an anti-seepage effect, so that the problem that the engineering gravel layer and the tamped clay layer are collapsed due to rainwater seepage is solved; the shear strength is improved through the fine sand layer and the first gravel layer, and water permeating through the permeable asphalt layer, the fine sand layer and the first gravel layer flows along the anti-seepage geotechnical cloth and is drained to the two sides of the road, so that rainwater on the road surface is reduced.
Owner:SHANXI GUODONG CONSTRUCTION ENGINEERING CO LTD

Roadbed structure and construction method thereof

The invention relates to the technical field of roadbeds, in particular to a roadbed structure and a construction method thereof.The roadbed structure comprises a hard soil layer, a filling area is laid on the upper portion of the hard soil layer, the hard soil layer and the filling area form a foundation roadbed, a clay area is laid on the top of the filling area, and a soil roadbed is laid on the top of the clay area; various filling materials are adopted, especially weathered gneiss of an excavation section are used for filling the roadbed, borrowing soil and spoil soil are reduced, effective utilization of resources is achieved, the problem that filler is deficient is solved, a large amount of engineering cost is saved, and by means of combined use of the various filling materials, the construction efficiency is improved, and the construction cost is reduced. The characteristics of different materials are brought into full play, the overall performance and stability of the roadbed are improved, and the erosion resistance and slope stability of the roadbed are enhanced through the arrangement of the clay area and the slope protection module.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1

Load shedding protection structure for reconstruction of road above existing pipe gallery in soft soil area

The utility model discloses a load shedding protection structure for reconstruction of a road above an existing pipe gallery in a soft soil area. The load shedding protection structure comprises a light foam soil load shedding layer and a geogrid reinforced layer. The density of the light foam soil deloading layer is far lower than that of common embankment filled soil, the additional load of the lifting embankment above the existing pipe gallery can be reduced, differential settlement deformation of a foundation can be controlled by arranging a step-shaped connecting structure, meanwhile, geogrids are fully laid on the upper portion of the light foam soil, differential settlement of the common filled soil embankment and the light foam soil embankment is further reduced, and the construction efficiency is improved. The pavement structure durability is improved. According to the existing pipe gallery load shedding protection structure combining the light foam soil and the geogrid, settlement deformation of the existing pipe gallery under the embankment load can be reduced, differential settlement of the upper pavement structure can be controlled, large-scale excavation and renovation of the existing pipe gallery can be avoided, and the construction cost is saved.
Owner:NANJING TUNNEL & BRIDGE ADMINISTRATION CO LTD

Earth shoulder slip form paving equipment

The invention relates to the technical field of road shoulder soil material paving, in particular to soil shoulder slip form paving equipment which comprises a mechanical arm, a carrier plate is fixedly mounted at the bottom of the mechanical arm, a distributing device is arranged at one end of the carrier plate and comprises a hopper rotationally connected with the carrier plate, a discharging barrel is fixedly communicated with the bottom of the hopper, and the bottom of the discharging barrel is fixedly connected with the mechanical arm. And a forming template is arranged at the bottom of the discharging barrel and comprises a material frame, material intercepting plates are slidably connected to the two sides of the material frame in an inserted mode, a tamping device is arranged between the carrying plate and the material frame, and the tamping device comprises a first oil cylinder and a second oil cylinder which are fixedly connected with the carrying plate. According to the device, the two material intercepting plates move close to each other to cut and intercept redundant soil in the material frame to the positions above the material intercepting plates, then after the material frame moves to the next station for paving the soil, the intercepted soil continues to be paved to other road shoulder positions, coating is saved, and meanwhile the heights of the soil materials paved at different positions of the soil shoulder can be the same.
Owner:JIANG SU SHENG ZHEN JIANG SHI LU QIAO GONG CHENG ZONG GONG SI +1