Calculating method for extra large span chamber second liner supporting structure
A technology of support structure and calculation method, which is applied to wellbore lining, tunnel lining, underground chamber, etc., can solve the problems of unreasonable analog calculation method, large design thickness of secondary lining, inconvenient operation, etc., and achieves reliable calculation results, Simple operation and layered effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0031] The embodiment of the present invention discloses a calculation method for the second lining support structure of a super-large-span cavern, as shown in the figure, including the following steps:
[0032] a. Through the fitting analysis of the monitoring measurement data, the upper limit value D of the deformation of the cavern is obtained 1 . Only take the maximum deformation D of the cave vault 1拱顶 as an example.
[0033] Table 1 Vault settlement monitoring measurement data table
[0034] Cumulative date (d) 0 1 2 3 4 5.6.... current day Settlement (mm) 0 1.85 3.05 8.8 14.2 ...... 14.5
[0035] Table 1 shows the settlement measurement data of the vault position, and the fitting curve ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com