Application method of stone chips in concrete pipe pile prefabrication
A technology of concrete pipe piles and application methods, which is applied in the direction of sheet pile walls, manufacturing tools, supply devices, etc., can solve problems affecting the sustainable development of pipe piles, meet the needs of sustainable development, widely distribute stone resources, reduce cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0010] Embodiment 1, the application method of stone chips in the prefabrication of concrete pipe piles, which uses a crusher to carry out primary crushing of stones. After crushing, the particle diameter of the stone chips is 5-15cm. After the primary crushing, the stone chips are subjected to secondary crushing. After the secondary crushing, the diameter of the stone chips is 1-3cm. After the secondary crushing, the stone chips are subjected to the third-stage crushing. The diameter of the stone chips after crushing is 1-3mm. The stone chips after the third-stage crushing are transferred to the concrete mixer and cement Stir with water, and after stirring, the concrete mortar is output to the pipe pile prefabrication through the conveying device.
Embodiment 2
[0011] Embodiment 2, the application method of stone chips in the prefabrication of concrete pipe piles, which uses a crusher to carry out primary crushing of stones. After crushing, the particle diameter of stone chips is 5-15cm. After the primary crushing, the stone chips are subjected to secondary crushing. After the secondary crushing, the diameter of the stone chips is 1-3cm. After the secondary crushing, the stone chips are subjected to the third-stage crushing. The diameter of the stone chips after crushing is 3mm. The stone chips after the third-stage crushing are transported to the concrete mixer and cement and water through the conveyor belt. After stirring, the concrete mortar is output to the pipe pile prefabrication through the conveying device.
[0012] Embodiment 2, the application method of stone chips in the prefabrication of concrete pipe piles, which uses a crusher to carry out primary crushing of stones. After crushing, the particle diameter of stone chips i...
PUM
Property | Measurement | Unit |
---|---|---|
diameter | aaaaa | aaaaa |
diameter | aaaaa | aaaaa |
diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com