BIM-based highway engineering rapid cost method

A cost-effective and fast technology, applied in special data processing applications, instruments, finance, etc., can solve problems such as insufficient application areas, imperfect cost management functions of BIM collaborative platform, etc., and achieve intelligent and objective investment decision-making management

Pending Publication Date: 2020-10-30
长沙垚森工程科技有限公司
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the domestic construction field has achieved good development in BIM, but the application of BIM technology in road construction projects is relatively insufficient
The engineering cost BIM software that conforms to the domestic pricing rules is still in the initial testing stage, and the cost management (5D) function of the BIM collaborative platform is not yet perfect

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based highway engineering rapid cost method
  • BIM-based highway engineering rapid cost method
  • BIM-based highway engineering rapid cost method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] The implementation block diagram of the rapid cost method based on the BIM platform described in the embodiment of the present invention is as follows figure 1 As shown, it mainly includes BIM entity measurement database, CTPD construction process database and SPPD list valuation database. The steps to realize the quick cost are as follows.

[0023] S101: Decompose the construction process of a certain project into process A, process B, process C, and process D, and realize the process combination of process A-process B-process C-process D, corresponding to the smallest unit 1-the smallest unit in CTPD 2-minimum unit 3-minimum unit 4 process combinations.

[0024] S102: Connect the smallest units 1, 2, 3, and 4 to the BIM platform and the SPPD list pricing library respectively, obtain their corresponding BIM entity measurements in the BIM metering library through unified coding rules, and store them in the list pricing library SPPD Obtain the corresponding constructio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a BIM (Building Information Modeling)-based highway engineering rapid manufacturing cost method. The method is based on a BIM unified coding rule. The method comprises the following steps: establishing a relatively comprehensive highway construction process flow library CTPD (Construction Technology Process Database) and SPPD (Set the Prince of Process Database), and enabling a BIM component to be endowed with the process attribute and the component price attribute corresponding to the BIM component through the CTPD and the process component price library (SPPD), so therapid and accurate manufacturing cost is realized, and the manufacturing cost speed and efficiency are improved; after CTPD and SPPD are established, automatically identifying and artificially establishing a basic standardized model based on the BIM platform; based on geometrical information of the model, realizing the calculation of sub-project quantities by adding non-geometrical information and setting an algorithm conforming to project quantity calculation rules; selecting a procedure combination of the subentry engineering construction process through the CTPD intelligent identification;based on the selected process combination, reading the group price block in the SPPD to realize conversion from model thinking to data thinking.

Description

technical field [0001] The invention relates to the field of highway engineering cost methods, in particular to a CTPD-SPPD rapid cost method based on a BIM platform. Background technique [0002] The pricing method often used in highway projects is still the fixed pricing method. However, as my country's planned economy integrates with the market economy, the mandatory quotas that have served the planned economy period for a long time cannot meet the needs of the highway industry. my country's highway industry should actively integrate with foreign countries, and explore the application prospects and feasibility of the bill of quantities valuation model in my country. [0003] Quantitative pricing is to calculate the engineering quantity of each sub-item according to the calculation rules of the fixed engineering quantity implemented, and calculate the cost of labor, materials and machines according to the unit valuation table and information guidance price issued by the co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06Q40/06
CPCG06F30/13G06Q40/06
Inventor 陈宝光汪优赵晓薇肖颜王振宇
Owner 长沙垚森工程科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products