Construction process of zero-leakage waterproof system
A construction technology and waterproof membrane technology, which is applied in the direction of building components, coatings, building insulation materials, etc., can solve the problems of waterproof system leakage, affecting the quality of buildings, etc., to achieve easy maintenance, shorten the construction period, and easy construction Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Example Embodiment
[0058] Example 1:
[0059] A construction process for a zero-leakage waterproof system, comprising the following steps:
[0060] Step 1: Base Cleanup
[0061] Clean the sand, gravel and dust on the outer surface of the base layer;
[0062] Step 2: Apply Base Treatment
[0063]Apply the prepared treatment agent to the cleaned outer surface of the base layer;
[0064] The treating agent comprises the following components in parts by weight:
[0065] 20 parts of asphalt 70#; 1 part of oleic acid; 2 parts of flake alkali; 3 parts of OP-10; 2 parts of water glass; 1.5 parts of PVA; 1 part of polyacrylamide, 40 parts of water.
[0066] Step 3: Detail Node Processing
[0067] Viscose composite mesh cloth is used for treatment at the yin and yang corners, water drop openings, and roof structures;
[0068] Step 4: Try laying the waterproofing membrane
[0069] Unroll the waterproof membrane on the base layer, and roll it back after determining the position;
[0070] The waterpr...
Example Embodiment
[0079] Example 2:
[0080] A construction process for a zero-leakage waterproof system, comprising the following steps:
[0081] Step 1: Base Cleanup
[0082] Clean the sand, gravel and dust on the outer surface of the base layer;
[0083] Step 2: Apply Base Treatment
[0084] Apply the prepared treatment agent to the cleaned outer surface of the base layer;
[0085] The treating agent comprises the following components in parts by weight:
[0086] Wherein, the treatment agent comprises the following components in parts by weight:
[0087] 35 parts of asphalt 70#; 1.5 parts of oleic acid; 2.5 parts of flake alkali; 3.2 parts of OP-10; 2.5 parts of water glass; 1.7 parts of PVA; 1.5 parts of polyacrylamide, 50 parts of water;
[0088] Step 3: Detail Node Processing
[0089] Viscose composite mesh cloth is used for treatment at the yin and yang corners, water drop openings, and roof structures;
[0090] Step 4: Try laying the waterproofing membrane
[0091] Unroll the wa...
Example Embodiment
[0101] Example 3:
[0102] A construction process for a zero-leakage waterproof system, comprising the following steps:
[0103] Step 1: Base Cleanup
[0104] Clean the sand, gravel and dust on the outer surface of the base layer;
[0105] Step 2: Apply Base Treatment
[0106] Apply the prepared treatment agent to the cleaned outer surface of the base layer;
[0107] The treating agent comprises the following components in parts by weight:
[0108] The treatment agent described in step 2 includes the following components in parts by weight:
[0109] 50 parts of asphalt 70#; 2 parts of oleic acid; 3 parts of flake alkali; 3.5 parts of OP-10; 3 parts of water glass; 2 parts of PVA; 2 parts of polyacrylamide, 60 parts of water;
[0110] Step 3: Detail Node Processing
[0111] Viscose composite mesh cloth is used for treatment at the yin and yang corners, water drop openings, and roof structures;
[0112] Step 4: Try laying the waterproofing membrane
[0113] Unroll the wa...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap