Auxiliary examination method for power transformation research automatic rule based on building information
A building information, automatic technology, applied in office automation, instruments, data processing applications, etc., can solve problems such as heavy workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.
[0029] In order to make those skilled in the art more clearly understand the purpose, technical solutions and advantages of the invention, the invention will be further elaborated below in conjunction with the accompanying drawings and embodiments.
[0030] Such as figure 1 As shown in FIG. 1 , it shows a schematic diagram of the main flow of an embodiment of an auxiliary review method for automatic rules of substation feasibility study based on building information provided by the present invention. In this embodiment, the auxiliary review method for automatic rules of substation feasibility study based on building information includes the following steps:
[0031]...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com