Mine side slope ecological restoration method
An ecological restoration and slope technology, applied in the field of mountain slope protection, can solve problems such as bad impact, landslides and mudslides, pedestrian and traffic safety hazards, etc., and achieve the effect of restoring ecological landscape and strengthening slope structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] Such as figure 1 As shown, the angle between the slope of the mine slope 1 and the ground is trimmed to 50°.
[0047] Such as image 3 As shown, in step S2, the base 22 is integrally bound and connected with the reinforcement mesh 21 by means of steel bars.
[0048] Such as figure 1 and 2 As shown, in step S2, a steel anchor rod 23 with a diameter of 10 centimeters and a length of 2 meters should be selected. In the hole, then pour concrete in the hole to make it connected with the mountain body of the mine slope 1 under force, and the end of the anchor rod 23 is fixedly connected to the base 22 by bolts.
[0049] Such as figure 1 and 4 As shown, in step S3, the length of the planting groove 3 is the same as the length of the two adjacent bases 22 in the transverse direction, and the planting grooves 3 are arranged in a stepped manner adjacent to each other in the longitudinal direction.
[0050] In the S4 step, the biomass nutrient soil comprises the following c...
Embodiment 2
[0056] Such as figure 1 As shown, in step S1, the angle between the slope of the mine slope 1 and the ground is trimmed to 55°.
[0057] Such as image 3 As shown, in step S2, the base 22 is integrally bound and connected with the reinforcement mesh 21 by means of steel bars.
[0058] Such as figure 1 and 2 As shown, in step S2, a steel anchor rod 23 with a diameter of 12.5 centimeters and a length of 2.5 meters should be selected. In the hole, and then by pouring concrete in the hole, it is connected with the mountain body of the mine slope 1 under force, and the end of the anchor rod 23 is fixedly connected with the base 22 by bolts.
[0059] Such as figure 1 and 4 As shown, in step S3, the length of the planting groove 3 is the same as the length of the two adjacent bases 22 in the transverse direction, and the planting grooves 3 are arranged in a stepped manner adjacent to each other in the longitudinal direction.
Embodiment 3
[0066] Such as figure 1 As shown, in step S1, the angle between the slope of the mine slope 1 and the ground is trimmed to 60°.
[0067] Such as image 3 As shown, in step S2, the base 22 is integrally bound and connected with the reinforcement mesh 21 by means of steel bars.
[0068] Such as figure 1 and 2 As shown, in step S2, a steel anchor rod 23 with a diameter of 15 centimeters and a length of 3 meters should be selected. In the hole, then pour concrete in the hole to make it connected with the mountain body of the mine slope 1 under force, and the end of the anchor rod 23 is fixedly connected with the base 22 by bolts.
[0069] Such as figure 1 and 4 As shown, in step S3, the length of the planting groove 3 is the same as the length of the two adjacent bases 22 in the transverse direction, and the planting grooves 3 are arranged in a stepped manner adjacent to each other in the longitudinal direction.
[0070] In the S4 step, the biomass nutrient soil comprises t...
PUM
Property | Measurement | Unit |
---|---|---|
Diameter | aaaaa | aaaaa |
Length | aaaaa | aaaaa |
Diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com