Method for treating wellhead of waste oil well in soft mud layer
A treatment method and oil well technology, which is applied in wellbore/well components, drilling equipment, earthwork drilling and production, etc., and can solve problems such as position deviation and water accumulation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] Such as figure 1 As shown, a method for treating the wellhead of an abandoned oil well in the soft mud layer, step 1), using large-scale equipment forklifts, excavators, and dump trucks to excavate and transport the soil layer near the surface wellhead until the large-scale equipment in the soft mud layer Stop working when unable to work;
[0029] Such as figure 2 As shown, step 2), manually process or customize the φ1200mm*L3000mm*D8mm pipeline, use the crane to transfer the φ1200mm*L3000mm*D8mm pipeline outside the wellhead of the abandoned oil well, and align the center of the φ1200mm*L3000mm*D8mm pipeline with the center of the abandoned oil well wellhead into the ooze layer;
[0030] Step 3), use a forklift to press the pipeline into the soft mud layer, and then manually process the sludge in the pipeline. During the cleaning process, the pipeline will settle downward. When the difference between the upper edge of the pipeline and the sludge outside the pipeline...
Embodiment 2
[0034] 1. If Figure 1-5 As shown, a method for treating the wellhead of an abandoned oil well in a soft mud layer is characterized in that it comprises the following steps:
[0035] Step 1), use large-scale equipment forklifts, excavators, and dump trucks to excavate and transport the soil layer near the surface wellhead until the large-scale equipment in the soft mud layer cannot operate.
[0036] Step 2), manually process or customize the φ1200mm*L3000mm*D8mm pipeline, use the crane to transfer the φ1200mm*L3000mm*D8mm pipeline outside the wellhead of the abandoned oil well, and place the center of the φ1200mm*L3000mm*D8mm pipeline coincident with the center of the abandoned oil well wellhead into the soft in the mud layer.
[0037] Step 3), use a forklift to press the pipeline into the soft mud layer, and then manually process the sludge in the pipeline. During the cleaning process, the pipeline will sink downward. When the difference between the upper edge of the pipelin...