Ecological gabion cell revetment structure and construction method thereof
A gabion, ecological technology, applied in the field of ecological gabion revetment structure and its construction, can solve the problems of small workload, construction speed, heavy workload, unfavorable plant growth, etc., to improve the connection strength and connection speed, speed up The effect of laying speed and simplification of construction steps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Please refer to the attached Figure 1-10 , the present invention provides a technical solution: an ecological gabion cell revetment structure, including a gabion cage 19, the gabion cage 19 is composed of a plurality of wire meshes 22 spliced, wherein two adjacent wires The nets 22 are connected in series through spiral steel wires 18, the gabion cages 19 are filled with filler materials, and a plurality of pipe piles 1 are vertically inserted in the gabion cages 19, and the side walls of the plurality of pipe piles 1 are connected with fixing mechanisms , the fixing mechanism is connected with the gabion cage 19, the lower end of the pipe pile 1 extends to the outside of the gabion cage 19, the filling material is composed of a construction waste layer 21 and a crushed stone layer 20, and the crushed stone layer 20 is embedded with a water collection Pipeline 11, water inlet pipe 13 is fixedly connected to the pipe wall of water collection pipe 11, and arc-shaped guar...
Embodiment 2
[0041] Compared with embodiment 1, its difference is:
[0042] Refer to attached Figure 1-4 , the fixing mechanism includes a round steel tie bar 5, the center of the round steel tie bar 5 is provided with a bending part 4, and a reinforcing rib 3 is inserted in the bending part 4, and both ends of the round steel tie bar 5 are bent and formed with The pull hook 6 of the arc-shaped structure, one end of the pull hook 6 is bent to be provided with a clamping part 9, and the side wall of the pipe pile 1 is symmetrically provided with a plurality of evenly distributed positioning holes 7, wherein the two positioning holes 7 are jointly sleeved with tie rods. The wire 23 and the binding wire 23 are galvanized iron wires, the drag hook 6 is clamped with the side wall of the pipe pile 1, the clamping part 9 is inserted into the positioning hole 7, and the side wall of the pipe pile 1 is fixedly connected with a plurality of positioning blocks 2 that are evenly distributed. , the l...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com