Primary support construction method for segmented tunneling of large-span tunnel
A primary support and construction method technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of reducing the safety of construction operations, long construction period, and time-consuming and laborious erection, so as to reduce the risk of structural damage and reduce the The effect of input cost and shortened construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Example Embodiment
[0027] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0028] like Figure 1-3 As shown, an initial support construction method for segmented excavation of a large-span tunnel includes the following steps:
[0029] Step 1: According to the actual working conditions, divide the excavation area of N sections along the width direction of the tunnel, and N is not less than 2;
[0030] Step 2: According to the excavation footage, along the tunnel excavation direction, excavate the first excavation area;
[0031] Step 3: Arrange and install an arc-shaped feeder 2 at the top of the first excavation area along the tunnel excavation direction, install a temporary support device 1 at the end of the arc-shaped feeder, and connect the temporary support device to the side wall 4 of the rock formation to be opened. Connected, the adjacent arc-shaped supply pieces are connected by connecting steel bars 9, and t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap