Comprehensive improvement method for salt farm field soil and Vegetation
A technology of soil improvement and saline-alkali flats, which is applied in the fields of land preparation, restoration of polluted soil, agriculture, etc., can solve the problems that farmers cannot accept the cost, and achieve the effects of protecting land resources, reducing improvement costs, and increasing grain planting area
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Embodiment 1: the comprehensive improvement method of salt-alkaline flat farmland soil and vegetation, it carries out soil improvement with a thickness of 0.4m on the ground surface on the plot to be improved, and specifically includes the following steps:
[0035] (1) Divide each plot to be improved into work blocks with a width of 20m and a length of several meters;
[0036] (2) Excavate the main blind ditch and branch ditch on the land to be improved. The main ditch is 0.3m×0.7m, and the branch ditch is 0.3×0.4; The ditch vertically intersects with the blind ditch of the branch water, which is in the shape of a fishbone; the main blind ditch is dug in the middle of each working section, and the two sides of each main ditch are to prevent the loss of natural rainfall Small square furrows, small square furrows should be made at every 10m on both sides of the main water blind ditch, and the soil moisture will be discharged into the branch water blind ditch according to ...
Embodiment 2
[0043] Embodiment 2: a method for comprehensive improvement of salt-alkaline flat farmland soil and vegetation, which carries out soil improvement with a thickness of 0.4m on the ground surface on the required improvement plot, and specifically includes the following steps:
[0044](1) Divide each plot to be improved into work blocks with a width of 20m and a length of several meters;
[0045] (2) Excavate the main blind ditch and branch ditch on the land to be improved. The main ditch is 0.3m×0.7m, and the branch ditch is 0.3×0.4; The ditch intersects vertically with the blind ditch of the branch water, which is in the shape of a fishbone: the main blind ditch is dug in the middle of each working section, and the two sides of each main ditch are to prevent the loss of natural rainfall Small square furrows, small square furrows should be made at every 10m on both sides of the main water blind ditch, and the soil moisture will be discharged into the branch water blind ditch acc...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com