Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation

A technology for network reconfiguration and power grid planning, applied in AC network circuits, flexible AC transmission systems, electrical components, etc., can solve problems such as poor local precision optimization capabilities, improve work quality and work efficiency, and reduce maintenance. Effect

Active Publication Date: 2014-12-10
STATE GRID TIANJIN ELECTRIC POWER +2
View PDF3 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the current application of genetic algorithm also has the disadvantage of poor local accurate optimization ability.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation
  • Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation
  • Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0105] Embodiments of the present invention are described in further detail below in conjunction with the accompanying drawings:

[0106] It should be emphasized that the embodiments described in the present invention are illustrative rather than restrictive, so the present invention is not limited to the embodiments described in the specific implementation, and those skilled in the art according to the technical solutions of the present invention Other obtained implementation modes also belong to the protection scope of the present invention.

[0107] A method for constructing power grid planning based on network reconfiguration and optimization power flow simulation calculation, such as figure 1 As shown, this method is based on the power grid simulation platform, adding a network reconfiguration subsystem and a power flow optimization subsystem. The platform is connected so that the power grid simulation platform has the power grid planning function, and the steps of the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a power network planning construction method based on network reconstruction and optimized load-flow simulating calculation. The power network planning construction method based on the network reconstruction and the optimized load-flow simulating calculation comprises the steps that load-flow of a power system is calculated by a digital simulation module in a power network simulation platform, constraint of a future power network is set by an operator, interface service calls used for power network planning are increased, a network reconstruction subsystem obtains power network data, rules followed by the network reconstruction subsystem in calculation are determined, calculation constraint is determined, the network reconstruction subsystem acquires an optimal solution, artificial interfering correction is conducted to a network reconstruction result, the result is written into the power network simulation platform, an optimized load-flow subsystem obtains power network data, constraint is determined before the calculation of the optimized loading-flow subsystem, optimized load-flow calculation is developed, the result is exported and sent to the power network simulation platform, artificial interfering correction is conducted to the exported result, and the result after the artificial interfering correction is stored in the power network simulation platform. The power network planning construction method based on the network reconstruction and the optimized load-flow simulating calculation largely improves the working efficiency of power network planning and the efficiency of a power network operation mode, and thus a power network planning working process which is convenient and high in efficiency is created.

Description

technical field [0001] The invention belongs to the technical field of power system calculation and simulation, in particular to a method for constructing a grid planning based on network reconfiguration and optimization power flow simulation calculation. Background technique [0002] Grid planning, also known as transmission system planning, is based on load forecasting and power supply planning. Power grid planning determines when and where to invest in what type of transmission lines and the number of circuits to achieve the required transmission capacity within the planning cycle, and to minimize the cost of the transmission system on the premise of meeting various technical indicators. [0003] Power grid planning is classified according to time and can be divided into short-term planning, medium-term planning and long-term planning. The short-term plan is divided into 1-5 years, and the content of the plan is more specific and careful, which can be directly used to gu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J3/00
CPCY02E40/16Y02E40/10
Inventor 魏珍林昌年陈捷魏文辉袁启海周骥飞高平王彬周书进周若蝶海晓涛
Owner STATE GRID TIANJIN ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products