A measurement method and technology of settlement, which is applied in the directions of measuring devices, height/level measurement, surveying and navigation, etc., can solve the problems such as the large influence of human factors, and achieve the effects of improving quality control, shortening construction period, and saving costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0013] Embodiment: Before the construction of the caisson, the control axis 3 of the well body is extended during the setting-out process of the caisson, and four concrete buttresses 1 are made on the extended axis. The horizontal distance between the concrete buttresses and the well body is greater than The subsidence depth of the well should be easy to observe and not be affected by the construction of the caisson. The size of the pier is 500mm×500mm×500mm cube, the buried depth is 400mm, and the elevation of the top of the pier should be consistent. A laser, or a laser flashlight. Such as figure 1 , the lasers are installed on the same axis and at the same elevation. The surrounding area should be well maintained to prevent equipment damage.
[0014] After the well body is constructed and before it is ready to sink, a vertical scale line should be drawn on the infrared control axis outside the well wall.
[0015] When the well body is sinking, by observing the relative p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com