A technology of circulating water system and supporting structure, applied in the field of circulating water system and circulating water system of power plant, can solve the problems of difficulty in relocation of structures, increase the operating cost of power plant, increase the area of land acquisition, etc., so as to reduce the scope of influence and complexity. performance, design and construction convenience, and the effect of reducing engineering investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0036] refer to Figure 1 to Figure 4The tunnel opening support structure of the power plant circulating water system disclosed in this embodiment includes a steel arch 10. The upper part of the steel arch is arc-shaped, and several cement blocks are arranged on the top of the tunnel entrance 11 and the vicinity of both sides. Stirring piles form a cement slurry mixing reinforcement area 1; a number of grouting anchors are installed on the top of the tunnel mouth to form a reinforcement structure 2 for the grouting anchors on the top of the tunnel; a number of grouting steel pipes are installed in the arc area on the top of the tunnel mouth to form Long tube shed structure 3; a number of soil-retaining cast-in-situ piles are arranged on both sides of the tunnel entrance passage outside the tunnel entrance to form the soil retaining support for the tunnel entrance passage outside the tunnel entrance 4; steel arch frame 10, cement slurry mixing reinforcement area 1, grouting The...
specific Embodiment 2
[0052] The characteristic of Embodiment 2 of the present invention is that: in the supporting structure of the tunnel entrance of the circulating water system of the power plant, according to the condition of the soft soil at the tunnel entrance, the tunnel entrance protection arch 5 is omitted. All the other structures are with specific embodiment 1.
specific Embodiment 3
[0053] The characteristic of the specific embodiment 3 of the present invention is: in the support structure of the tunnel mouth of the circulating water system of the power plant involved, according to the soft soil condition of the tunnel entrance outside the tunnel mouth, the water-stop jet spraying pile 6 is omitted. All the other structures are with specific embodiment 1.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com