Method for retarding and scattering running water through bamboo fence
A bamboo fan and runoff technology, which is applied in the field of stagnant runoff, can solve the problems of difficult to achieve the goal of site preparation, the soil is easy to fall and fall, and the cost is high, and achieve the effect of reducing surface water evapotranspiration, high promotion and application value, and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] 1. Construction technology of bamboo fan on phyllite waste slag slope without erosion ditch. The slope is relatively flat with no erosion ditch. The deposits on the slope surface are road construction spoils, phyllite debris flakes, slippery, easy to scatter and slide each other; debris is easy to weather, easy to muddy when exposed to water, and under the lubrication of saturated infiltration rainwater, the debris is muddy. creep or collapse along the slope. The average slope of the slope exceeds 35°, and collapsed and scattered remnants can be seen in the steep middle of the slope. Bamboo fan construction steps: 1) Cut bamboo sections 4-7cm thick and 80-100cm long, cut the lower end into a horse-ear shape, add pads to the upper end and ram it into the soil, and leave 30-40cm outside as fan piles. 2) Drill piles in rows along the contour of the slope, with a pile distance of 70-100cm. 3) Thin bamboo poles with a thickness of 1 to 1.5 cm are laid horizontally and sta...
Embodiment 2
[0023] Construction technology of bamboo fan on phyllite waste slope with erosion ditch. The slope surface is relatively broken, and there is an erosion ditch in the middle that runs from the top to the bottom of the slope. The deposits on the slope surface are road construction spoils, phyllite debris flakes, slippery, easy to scatter and slide each other; debris is easy to weather, easy to muddy when exposed to water, and under the lubrication of saturated infiltration rainwater, the debris is muddy. creep or collapse along the slope. The average slope of the slope exceeds 35°, and collapsed and scattered remnants can be seen in the steep middle of the slope. Bamboo fan construction steps: 1) Cut bamboo sections 4-7cm thick and 80-100cm long, cut the lower end into a horse-ear shape, add pads to the upper end and ram it into the soil, and leave 30-40cm outside as fan piles. 2) Drill piles in rows along the contour of the slope, with a pile distance of 70-100cm. 3) Thin ba...
Embodiment 3
[0025] Construction technology of bamboo fan for phyllite rock landslides and sliding slopes. The slope surface is formed by the weathering and slumping of exposed phyllite, which is relatively broken, with a slope of 25°-30° and large fluctuations. The deposits on the slope surface are phyllite debris, flaky, slippery, and easy to fall and slide; the debris is easy to weather and muddy when exposed to water. Under the lubrication of saturated infiltration rainwater, the debris is muddy along the slope direction. Creep or collapse scattered. Bamboo fan construction steps: 1) Cut bamboo sections 4-7cm thick and 80-100cm long, cut the lower end into a horse-ear shape, add pads to the upper end and ram it into the soil, and leave 30-40cm outside as fan piles. 2) Drill piles in rows along the contour of the slope, with a pile distance of 70-100cm. 3) Thin bamboo poles with a thickness of 1 to 1.5 cm are laid horizontally and stacked side by side to form a fan row. The thin bambo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com