A technology for blast furnaces and residual iron, applied to blast furnaces, blast furnace details, blast furnace parts, etc., can solve the problems of time-consuming and labor-intensive cycle, remove manual operations, etc., and achieve the effect of convenient operation, improved cleaning speed, and fast demolition speed
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2015-06-24
Smart Images
Figure 1
Abstract
Description
technical field
[0001] The invention relates to a maintenance process of metallurgical equipment, in particular to a method for quickly removing waste and residual iron in a blast furnace during overhaul. Background technique
[0002] During the overhaul of the metallurgical ironmaking blast furnace, it is necessary to remove and clean up all the residual charge, nodules, carbon bricks in the furnace, and residual iron clots in the blast furnace. The traditional cleaning method is to use a water gun from the top of the furnace to cool down the furnace when the blast furnace stops ironmaking and the residual iron in the furnace is released. The tuyere enters the furnace, and manual cleaning and dismantling are performed using operating tools such as picks and shovels. The dismantled furnace waste is removed from the furnace bottom residual iron release port, and then transported to the designated place by the loader. When the waste in the furnace is cleaned up to the residu...
Examples
Embodiment Construction
[0018] The used tool of the present invention comprises: one 60-type excavator, two gas welding and cutting torches, some 5-ton chain-reversing, some 30-ton jacks, and three 100-ton jacks. see figure 1 As shown, the rapid removal method of scrap and residual iron in the furnace in the blast furnace overhaul of the present invention comprises the following steps:
[0019] a. After the blast furnace stops ironmaking and the residual iron in the blast furnace is released, first use a water gun to pump water from the manhole 4 on the furnace roof of the blast furnace body 1 to cool down the furnace until the temperature in the furnace drops to a level suitable for construction personnel. When the entering temperature (about 20-30°C) can stop the operation of fetching water and cooling down.
[0020] b. Construction workers remove the large, middle and small sets of all the hot air outlets 15 on the blast furnace body 1 and transport them away from the blast furnace.
[0021] c. ...