Combined wire winding cylinder device

The invention is suitable for the technical field of spinning twisters, and provides a combined type wire winding cylinder device which comprises a bottom plate, two supporting columns are arranged on the bottom plate, two concave connecting shafts are rotationally connected to the opposite faces of the two supporting columns, a wire winding cylinder is arranged between the two concave connecting shafts, and the wire winding cylinder is arranged on the bottom plate. A convex connecting shaft is fixedly connected to the surface of the side, close to the concave connecting shaft, of the wire winding barrel, the convex connecting shaft is connected with the concave connecting shaft in a mortise and tenon joint mode, a transverse adjusting assembly for controlling the two supporting columns to transversely move is arranged on the bottom plate, and a supporting assembly for supporting the wire winding barrel is arranged on the lower side of the convex connecting shaft. According to the device, the combined wire winding barrel is arranged, so that the operation steps of mounting and dismounting the wire winding barrel are simplified, and the efficiency and speed of mounting or dismounting the wire winding barrel are improved.
Owner:JIANGSU RUICHANG COMPOSITE MATERIALS CO LTD

Wall dismantling device for indoor engineering

The invention relates to the related technical field of wall dismantling, and discloses a wall dismantling device for indoor engineering, which is characterized in that a rear end block is connected to the rear side of a protection frame, an equipment control box is connected to the upper surface of the rear end block, a cutting device is connected to the front side surface of the protection frame, and side end retaining wall devices are symmetrically arranged on the two sides of the cutting device; the cutting device comprises a cutting driving machine, the output end of the cutting driving machine is connected with a cutting blade, and spring telescopic pipes are symmetrically arranged at the two ends of the cutting driving machine. According to the method, the risk of accidents in the construction process can be greatly reduced, the safety of operators and other field personnel is guaranteed, compared with manual dismantling and mechanical cutting, the dismantling speed can be remarkably increased, especially when a large-area or multi-layer wall body is processed, tasks can be rapidly completed, the engineering period is shortened, and the construction efficiency is improved. The overall construction efficiency is improved.
Owner:FUJIAN EXPRESSWAY MUNICIPAL ENG CO LTD

A sleeve with anti-slip function

This invention discloses a sleeve with anti-slip function, relating to the field of sleeves. It includes a sleeve assembly with a coating and clamping mechanism at its top. The coating and clamping mechanism includes a mounting box, the bottom of which is fixedly connected to the top of the sleeve body. The coating and clamping mechanism is used to clamp the required screw and adjust the clamping distance according to the screw size. During the adjustment of the clamping distance, the coating and clamping mechanism controls the outflow of lubricating oil stored in the oil reservoir. During screw rotation, it applies lubricating oil to the mounting surface of the screw and the screw fixing point. A cam synchronously pushes a hollow shaft downwards during rotation, causing the lubricating oil inside the oil reservoir to be discharged through the outer surface of the hollow shaft, the oil guide hole at the bottom, and the gap between the hollow shaft and the oil guide tube. This reduces the frictional resistance between the screw and the screw fixing point, improves the smoothness of disassembling rusty screws, and thus increases the disassembly speed of rusty screws.
Owner:ZHEJIANG JUJIAN TECH CO LTD

Mold frame structure of air conditioner air outlet support injection mold

The utility model discloses a mould frame structure of an air conditioner air outlet bracket injection mould, which relates to the technical field of mould frames of injection moulds, and adopts the technical scheme that the mould frame structure comprises two mould frame mechanisms, each mould frame mechanism comprises an outer mould frame, a connecting seat is fixedly arranged on one side of each outer mould frame, and a mould core cavity and an inner cavity are respectively formed in each outer mould frame; the mold base structure of the air conditioner air outlet support injection mold has the beneficial effects that the top of the kernel unloading plate is pinched and dragged, so that the kernel unloading plate drives the first rack to slide along the longitudinal groove, the first rack moves and is matched with the first gear, and the transverse shaft drives the second gear to rotate; a second gear rotates to enable a connecting block to drive a connecting plate to move through a second rack, and the connecting plate moves to enable one end of a trapezoidal limiting plate to be collected into a through hole from a trapezoidal limiting groove, so that limitation of the mold core body in the through hole is relieved, the mold core body can be conveniently taken out of the through hole, the dismounting speed is high, tool operation is not needed, and operation is convenient. And the dismounting mode is more convenient.
Owner:ANHUI HANGJIA CHIYUAN ELECTRIC CO LTD

Intelligent end mold dismounting and mounting mechanism

The utility model discloses an intelligent end mold dismounting and mounting mechanism which comprises a trackless storage battery electric flat ground vehicle, a main frame mechanism is installed on the trackless storage battery electric flat ground vehicle, upper hydraulic structures are installed on the left side and the right side of the top of the main frame mechanism, and side hydraulic structures are installed on the left side and the right side of the main frame mechanism. The intelligent end mold disassembling and assembling mechanism relates to the technical field of box girder end mold disassembling and assembling, and is reasonable in structure, convenient to construct, capable of guaranteeing the quality and quantity, high in disassembling speed and complete and attractive in appearance quality; the device is simple in structure, convenient to use, capable of saving field equipment and labor, high in installation speed, accurate in positioning and high in efficiency, the situation that a mechanical jack works asynchronously in the dismantling process, consequently, concrete falls off and scratches occur in the hoisting process is avoided, the construction efficiency is improved, and people can use the device conveniently.
Owner:CHINA CONSTRUCTION EIGHTH ENGINEERING BUREAU CO LTD ANJU BEAM MAKING FACTORY +1

Method for dismantling support in concrete cylinder silo

The invention discloses a method for dismantling a support in a concrete cylinder silo. A hole is reserved in a conical shell right above a horizontal support, a first winch is arranged at a bottom platform in the silo, a second winch is arranged at a reserved hole in the top of the silo, a third pulley is fixed to the side face of the lower end of a center stand column on the bottom platform in the concrete cylinder silo, and a truss girder dismantling tool is adopted. According to the method, the specially designed tool is adopted, the hole reserved in the top of the silo is used for installing the pulley block, the winch is matched for dismantling the support in the concrete cylinder silo, dismantling of the support in the narrow space is achieved, the construction difficulty is small, and the dismantling speed of the support is increased.
Owner:CHINA RAILWAY NO 10 ENG GRP NO 1 ENG CO LTD +1

Construction method for dismantling hollow slab girder of approach bridge superstructure

The invention relates to the technical field of bridge construction, and provides an approach bridge superstructure hollow slab girder dismantling construction method which comprises the following operation steps: Step 1, determining a dismantling sequence: numbering each span of hollow slab girders, and determining the dismantling sequence of the hollow slab girders to be a middle girder, a secondary boundary girder and a final boundary girder; 2, preparation before dismantling is carried out, wherein a core drilling machine is matched with a rotary saw and a wire saw to cut hinge joints between the hollow plate beam plates; and Step 3, dismantling: dismantling the hollow slab girders span by span by using a bridge girder erection machine, and directly hoisting the hollow slab girders to a girder transporting gun carrier after dismantling to be transported to a breaking site for breaking. According to the dismantling method, the core drilling machine is matched with the rotary saw and the rope saw to cut the hinge joints between the hollow plate girders according to the dismantling sequence, the hollow plate girders are dismantled in a span-by-span dismantling mode in cooperation with the bridge erecting machine, the dismantling speed is high, segmentation according to the hinge joints is more convenient and rapid, ruins and large pollution cannot be generated compared with a blasting mode, and the construction efficiency is improved. And the tonnage of the bridge girder erection machine is relatively small, so that the safety is higher when hollow slab girders are hoisted.
Owner:SHANGHAI CIVIL ENG GRP SIXTH CO LTD

Rectangular aqueduct integral type steel formwork system

The utility model discloses an integral steel formwork system for a rectangular aqueduct. The steel formwork system comprises a bottom formwork system, an outer side formwork system, an inner side formwork system, an inner supporting system, a top cross beam system and an aqueduct pull rod hanging formwork system. The top beam system is hinged to the top end of the outer side mold system and the top end of the inner side mold system. The bottom end of the outer side die system is fixedly connected with the bottom die system; the inner supporting system supports the inner side formwork system, and the aqueduct pull rod formwork hanging system is arranged between the top of the inner side formwork system and the top cross beam system. Rectangular aqueduct pouring areas are formed between the outer side mold system and the inner side mold system and between the inner side mold system and the bottom mold system. The problems that an existing groove body formwork is low in efficiency, high in investment, long in construction period, prone to causing damage to a concrete structure and poor in construction convenience are solved.
Owner:SINOHYDRO BUREAU 8 CO LTD +1

Dismounting and mounting construction method for parallel heat exchangers in narrow space

The invention discloses a disassembly and assembly construction method for parallel heat exchangers in a narrow space. Hoisting holes are formed in an upper-layer frame platform of a heat exchanger to be disassembled, and steel pipes are laid at the hoisting holes to serve as hanging points of chain blocks; the to-be-disassembled heat exchanger and the steel pipe are connected through a chain block, the to-be-disassembled heat exchanger is lifted to a preset height, a guide rail is laid above the support, and a plurality of carrying tanks are placed on the guide rail. And the to-be-disassembled heat exchanger is lowered to the carrying tank through the chain block, the to-be-disassembled heat exchanger is horizontally moved out of the outer edge of the steel frame where the to-be-disassembled heat exchanger is located along the guide rails through the carrying tank under the cooperation of traction of the crane and the chain block, connection between the chain block and the to-be-disassembled heat exchanger is disconnected, and the to-be-disassembled heat exchanger is hoisted away through the crane. And during reassembly, the upper heat exchanger is firstly installed, then the lower heat exchanger is installed, the installation step is reverse operation when the heat exchangers are dismantled, and then the lower heat exchanger and the upper heat exchanger are assembled into a parallel heat exchanger and integrally hoisted through a chain block. The construction efficiency and safety are effectively guaranteed.
Owner:CHINA CHEM ENG SECOND CONSTR

Dismantling method for bridge piers, bent caps and straining beams located in slope slip zone soil range

The invention discloses a method for dismantling a pier, a bent cap and a straining beam in a slope slip band soil range, and belongs to the technical field of bridge dismantling methods.The method comprises the steps that firstly, a slope is leveled, concrete steel stand columns are installed on the two sides of a to-be-dismantled pier stand column, and a construction platform is built; firstly, a rope saw is used for dismantling a rubber support on the upper portion of a capping beam, an upper padstone is also directly cut and dismantled through the rope saw, after the capping beam is cut, the height of a construction platform is lowered, a bridge pier stand column on the upper portion of a tie beam is cut through the rope saw, and after the bridge pier stand column on the upper portion of the tie beam is cut, the construction platform continues to be lowered; and a constructor cuts the straining beam through a rope saw, after the straining beam is cut, the height of the construction platform continues to be reduced, the pier stand columns on the lower portion of the straining beam are cut till cutting is completely completed, and the construction platform is dismantled. The method has the advantages that the dismantling speed is high, the dismantling method is safe and reliable, large dismantling equipment is not needed, and the multiple pier stand columns can be dismantled at the same time.
Owner:CHINA RAILWAY FIRST GROUP CO LTD +3