Deep pressure artesian well plugging system and method
A deep and water layer technology, applied in the field of deep pressure artesian well plugging system, can solve the problems of groundwater artesian flow, etc., and achieve the effect of easy operation, low cost and simple construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] as attached figure 1 , 2 , 4 and 5, the deep-layer pressurized artesian well plugging system includes a hydrostatic column 1, and a multi-level monitoring pipe 2 is set inside the hydrostatic column 1, and the multi-level monitoring pipe 2 is a continuous multi-channel monitoring pipe , several channel pipes 16 are uniformly fixed in the continuous multi-channel monitoring pipe, and several channels corresponding to the positions of the aquifers 11 are respectively arranged on the pipe walls of the continuous multi-channel monitoring pipe and the hydrostatic column 1 The water inlet 3 connected by the pipe 16; on the wall of the continuous multi-channel monitoring pipe, a group of flanges 4 corresponding to the lower part of each relative water-resisting layer 12 are respectively welded, and a group of flanges 4 corresponding to the bottom of each relative water-resisting layer A kelp layer is wound between the flanges 4; a first circular hole 5 is provided on the surf...
Embodiment 2
[0062] as attached Figure 2-5 As shown, as the deep-layer pressurized artesian well plugging system described in Example 1, the difference is that an instant activation facility 8 is provided on the top of the continuous multi-channel monitoring pipe, and the instant activation facility 8 is installed on the continuous multi-channel monitoring pipe. A manual butterfly valve or a manual ball valve at the top of each single channel pipe 16 of the channel monitoring pipe.
[0063] The method of using the above-mentioned deep pressure artesian well plugging system in the water quality monitoring of karst groundwater for plugging is carried out according to the following steps:
[0064] (1) Install the hydrostatic column
[0065] After the drilling is completed, a hydrostatic column 1 whose upper end is higher than the ground is set in the well; the height of the hydrostatic column 1 is greater than the height of the gravitational potential energy converted from the hydrostatic p...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com