Construction method for tunnel double adit roof ripping
A construction method and technology for tunnels, which are applied in tunnels, tunnel linings, and earth-moving drilling and mining, etc., can solve problems such as high safety risks, complex stress, and easy deformation, achieve easy support, optimize stress structures, and speed up construction progress. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0030] see Figure 1 to Figure 4 The invention relates to a construction method for overhanging a double-branch tunnel of a tunnel, which is a large-section excavation construction method for a weak surrounding rock of a tunnel, and is mainly a construction method for overhanging a double-branch tunnel for a large-section tunnel; comprising the following steps:
[0031] Step one, construction preparation.
[0032] Step 2: On the basis of the parallel guide tunnel 1, excavate and support the upper branch tunnel 2 and the lower branch tunnel 3 by staggering back and forth, so that the climbing slope of the upper branch tunnel 2 intersects vertically with the upper part of the main tunnel 4, and the lower branch tunnel 3 has a flat slope. Intersect vertically with the bottom of Zhengdong 4.
[0033] Step 3: Set up a door-shaped steel f...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com