Unlock instant, AI-driven research and patent intelligence for your innovation.

Testing method for legal metering part of double-core electric energy meter

A test method and technology of electric energy meter, which is applied in the direction of measuring electric variables, measuring devices, instruments, etc., can solve the problems of increasing manpower and material costs, waste of resources, etc.

Active Publication Date: 2017-04-19
CHINA ELECTRIC POWER RES INST +1
View PDF4 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At the same time, with the gradual penetration of user experience concepts, there are more and more functional requirements for electric energy meters. At present, if you want to expand and upgrade functions, you can only implement it by installing new meters, which not only wastes resources, but also increases manpower and material cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Testing method for legal metering part of double-core electric energy meter
  • Testing method for legal metering part of double-core electric energy meter
  • Testing method for legal metering part of double-core electric energy meter

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] In order to further explain the technical means and effects of the present invention to achieve the intended purpose of the invention, the specific implementation, structure, features and effects of the present invention will be described in detail below in conjunction with the accompanying drawings and preferred embodiments.

[0021] see figure 1 The electric energy meter to be tested in the method for testing the legal metering part of the double-core electric energy meter of the present invention includes a legal metering part and a management part.

[0022] The legal metrology department includes metering chip, metering MCU, RS485 interface, battery, clock chip and memory. The metering chip is electrically connected to the metering MCU through the SPI line. The electric energy meter under test is electrically connected with the metering MCU through the RS485 interface and the battery. The clock chip and memory are electrically connected with the metering MCU. The...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a technical field, and especially relates to a testing method for a legal metering part of a double-core electric energy meter. The method comprises the steps that a detection table body receives an instruction of a PC, and outputs a signal to a detected electric energy meter; the detection table body obtains the metering data of the legal metering part of the detected electric energy meter under a plurality of testing conditions, and calculates error data according to metering data; the PC stores the error data, and carries out the fitting of an error curve according to the error data; the PC compares the error curve with a calibration standard, and obtains a comparison result. Because the detection table body calculates error data according to metering data, the PC stores the error data, and carries out the fitting of the error curve according to the error data, compares the error curve with the calibration standard, and obtains the comparison result. The method can detect the accuracy of independent operation of the legal metering part of the detected electric energy meter under the interference of various types of testing conditions.

Description

technical field [0001] The invention relates to the technical field, in particular to a testing method for the legal metrology department of a double-core electric energy meter. Background technique [0002] At present, my country's electric energy meter is designed in one piece, that is, the metering part and the non-metering part do not require independent work. This kind of energy meter has relatively solid requirements for software and hardware. Once a hardware or software failure occurs, the only way to replace the entire meter is to ensure the smooth progress of power metering. And for the safety consideration of preventing tampering with the energy meter program, the online upgrade of the energy meter software is not allowed. In the future competitive electricity market, out of the consideration of maximizing the interests of different electricity selling entities, the multi-rate electricity price day time division strategy formulated is more targeted, diverse and re...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G01R35/04
CPCG01R35/04
Inventor 段晓萌郜波姜洪浪王晓东左嘉王爽杨旭东陈康杰
Owner CHINA ELECTRIC POWER RES INST