Engineering equipment for bridge construction

A technology for engineering equipment and bridge construction, which is applied in bridge construction, bridge erection/assembly of bridges, etc. It can solve the problems of mechanical equipment damage, machine temperature rise, and the joints of steel wires and hooks are prone to fall off, etc., to increase firmness , Enhance the effect of firmness

CN107140569AInactive Publication Date: 2017-09-08CHENZHOU JINTONG INFORMATION TECH CO LTD
0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2017-09-08
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
Patent Text Reader

Abstract

The invention discloses engineering equipment for bridge construction, which comprises a machine body shell, a power bin and a motor cooling hole, a temperature controller and a temperature sensor are installed inside the machine body shell, a hanging rod is arranged on the top of the machine body shell, and the hanger The rod is used with a hanging rod lock, the right side of the body shell is installed with a signal receiving and transmitting antenna, and the lower side of the body shell is installed with a high-strength steel wire and a wire fixer; the end of the high-strength steel wire is fixed on the steel wire by a fastening ring On the nut, the steel wire fixing nut is fixedly installed on the connecting cylinder, the upper side of the connecting cylinder is connected with a steel wire-hook connecting plate, the middle position of the bottom of the connecting cylinder is provided with a high-strength hook, and the temperature controller and temperature sensor electrically connected. The steel wire and the hook of the present invention can be reliably and firmly connected, and can monitor the internal temperature of the equipment in a limited manner, effectively solve the problems existing in the prior art, and have more optimized use performance.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of bridge engineering, and in particular relates to engineering equipment for bridge construction. Background technique

[0002] Under the new situation, my country's bridge engineering construction has developed rapidly. During the development process, my country's bridge engineering has accumulated valuable experience. These experiences are obtained through continuous practice. It points out the direction for the development of my country's future bridge engineering construction technology. , Promoted the improvement of the technical level of bridge engineering. Judging from the current situation, the new technology of bridge engineering in my country is still developing and innovating, which provides better quality and more advanced construction technology for bridge construction in my country.

[0003] In the new era, the development trend of my country's bridge engineering is technological innovation an...

Examples

Embodiment Construction

[0028] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0029] see figure 1 and figure 2, the present invention provides a technical solution for engineering equipment for bridge construction: an engineering equipment for bridge construction, including a body casing 1, a power bin 2 and a motor cooling hole 3, and a temperature controller 10 and a temperature sensor 11 are installed inside the body casing 1 , the top of the body shell 1 is provided with a hanging rod 14, the hanging rod 14 is used in conjunction ...