A method for preventing ladle sticking slag in refining process
A refining process, ladle technology, applied in steel manufacturing process, manufacturing converter, metal processing, etc., can solve the problems of affecting refining operation, loss of coating, unfavorable continuous production, etc., to improve economic efficiency and improve service life. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] (1) Converter tapping: After the normal smelting of the converter, the tapping temperature is 1667°C, and the slag blocking treatment is adopted during the tapping process, and the thickness of the slag is 30mm.
[0027] (2) Transport the ladle to the refining position quickly, and the transport time is 8 minutes.
[0028] (3) The ladle is transported to the refining station, and the electrode is immediately lowered to the ladle to ensure that the anode is in contact with the slag and not in contact with the molten steel, and the cathode is in contact with the magnesia carbon brick and not in contact with the slag and molten steel, and then the slag and Apply a stable 20V voltage to the magnesia-carbon bricks for anti-slag treatment. After the ladle arrives at the refining station, the waiting time for the anti-slag treatment is 3 minutes. Bottom blowing gas agitation is carried out during the process.
[0029] (4) Stop blowing gas at the bottom 3 minutes before liftin...
Embodiment 2
[0033] (1) Converter tapping: After the normal smelting of the converter, the tapping temperature is 1680°C, and the slag blocking treatment is adopted during the tapping process, and the thickness of the slag is 35mm.
[0034] (2) Transport the ladle to the refining position quickly, and the transport time is 7 minutes.
[0035] (3) The ladle is transported to the refining station, and the electrode is immediately lowered to the ladle to ensure that the anode is in contact with the slag and not in contact with the molten steel, and the cathode is in contact with the magnesia carbon brick and not in contact with the slag and molten steel, and then the slag and Apply a stable 18V voltage to the magnesia-carbon brick for anti-slag treatment. After the ladle arrives at the refining station, the waiting time for the anti-slag treatment is 4 minutes. Bottom blowing gas agitation is carried out during the process.
[0036] (4) Stop blowing gas at the bottom 3 minutes before lifting...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com