Settlement system and method for electricity purchase subject in regional electricity market

A power market and power purchase technology, applied in the field of power systems, can solve problems such as the lack of an effective transmission mechanism for prices, costs, and profits, the lack of formation of a power transaction mechanism, and the unclear issue of scheduling independence, achieving a novel system structure, Significant economic and social benefits, the effect of reducing market risk

Active Publication Date: 2017-10-27
昆明电力交易中心有限责任公司
View PDF6 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, there is great resistance to the monopoly of electricity purchasers in the electricity market, and the electricity transaction mechanism has basically not been formed, and the effective transmission mechanism of prices, costs, and profits in each link has not been formed; the issue of independent scheduling is not clear, and there are many restrictions on independent transactions.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Settlement system and method for electricity purchase subject in regional electricity market
  • Settlement system and method for electricity purchase subject in regional electricity market
  • Settlement system and method for electricity purchase subject in regional electricity market

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0052] Such as figure 1 As shown, the regional power market power purchase entity settlement system in this embodiment includes:

[0053] The data collection module 100 is used to collect the day-ahead electricity transaction declaration benchmark value, daily transaction transaction results, monthly bilateral transaction transaction results, and monthly centralized transaction transaction results of the power purchase entity; the transaction results include transaction electricity and electricity prices; Collect the monthly trading power generation of the power purchase entity corresponding to the transaction power plant;

[0054] The metering module 101 is used to measure the actual electricity consumption of the electricity purchasing entity, and the actual electricity consumption includes daily actual electricity consumption and monthly actual electricity consumption;

[0055] Deviation setting module 102, used to set the baseline value of the daily electricity consumptio...

Embodiment 2

[0061] The difference between embodiment 2 and embodiment 1 is: the daily electricity deviation baseline value setting c% and m 1 Two parameters; specifically: the part of the uncompleted day-ahead power trading volume exceeding c% of the daily trading volume is expressed in m 1 The price of yuan / kWh pays the deviation electricity fee, and the part within c% is exempted from the deviation electricity fee. Among them, 0

[0062] The baseline value of the monthly electricity deviation is set to d% and m 2 Two parameters; specifically: the part of the less power consumption exceeding d% of the transaction power in the transaction results of the monthly centralized transaction is represented by m 2 The price of yuan / kWh pays the deviation electricity fee, and the part within d% is exempted from the deviation electricity...

Embodiment 3

[0064] Such as figure 2 As shown, a settlement method for power purchase entities in the regional power market, using the settlement system for power purchase entities in the regional power market described in Embodiment 1, includes the following steps:

[0065] Step (1), data acquisition: through the data acquisition module, collect the day-ahead electricity transaction declaration reference value U rdN , daily transaction results, monthly bilateral transaction transaction results, monthly centralized transaction transaction results, and at the same time collect the monthly transaction power generation Q of the power purchase entity corresponding to the transaction rt ;

[0066] Step (2), measurement and deviation setting: measure the actual power consumption of the power purchase entity, including daily actual power consumption and monthly actual power consumption, and at the same time, set the daily power consumption deviation of the power purchase entity Baseline value ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a settlement system and method for an electricity purchase subject in a regional electricity market, and belongs to the technical field of electric power systems. The system comprises a data collection module, a metering module, a deviation setting module, a day-ahead electricity settlement module, a monthly bilateral settlement module, a monthly centralized trading settlement module and a summarization settlement module. The system is novel in structure; the settlement process is reasonable and efficient; and through electricity price competition permission and electricity distribution and selling subject permission, effective technical support is provided for gradually nurturing multiple marketized competition patterns, breaking the monopolistic situation of a power grid company and forming an advanced electricity utilization transaction settlement mechanism.

Description

technical field [0001] The invention belongs to the technical field of electric power systems, and in particular relates to a settlement system and method for a power purchase subject in a regional power market. Background technique [0002] At present, in the electricity market, there is great resistance to the transaction monopoly of electricity purchasers, and the electricity transaction mechanism has basically not been formed, and the effective transmission mechanism of prices, costs, and profits in each link has not been formed; the issue of dispatch independence is not clear, and there are many restrictions on transaction independence. [0003] With the proposal of the new electricity reform plan, how to break the monopoly of power grid companies and gradually cultivate a diversified market-oriented competition pattern through reforms such as liberalization of competitive electricity prices and distribution and sales entities has become a top priority. Further, in the i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q20/14
CPCG06Q20/145
Inventor 王雪晋涂启玉王吉飞陈玲杨颜梦王帮灿周娜杨怡静张加贝
Owner 昆明电力交易中心有限责任公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products