Hard rock and bare rock river bed trestle for deep water high pier and long span bridge construction and construction method

A bridge construction and long-span technology, applied in bridges, bridge construction, bridge parts, etc., can solve the problems of difficult to guarantee the stability of steel piers, poor anchoring effect of steel piers, large amount of concrete pouring, etc., to achieve construction quality Easy to control, good anchoring effect, and simple construction

Active Publication Date: 2019-08-27
NO 1 ENG LIMITED OF CR20G
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the deep water exposed hard rock river bed and current state, it is impossible to install the steel casing for pile foundation construction and carry out mud circulation, and it is difficult to build a drilling platform. Therefore, it is difficult to use the traditional method of inserting steel sheet piles for construction or ordinary percussion drilling to form holes. , the anchoring of the trestle pier is a big problem; if the method of pouring underwater concrete to wrap the steel pier is used, the box-type formwork needs to be installed, the amount of concrete pouring is relatively large, and the construction quality is not easy to control, and the anchoring effect of the steel pier is poor. It is difficult to guarantee the stability of the steel pier in the case of flood discharge from the upper reaches of the Minjiang River during the flood season, and after the trestle bridge is used, it is necessary to use the blasting excavation method to remove the concrete to the original riverbed surface according to the relevant regulations of the channel and water conservancy department

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hard rock and bare rock river bed trestle for deep water high pier and long span bridge construction and construction method
  • Hard rock and bare rock river bed trestle for deep water high pier and long span bridge construction and construction method
  • Hard rock and bare rock river bed trestle for deep water high pier and long span bridge construction and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0053] Such as figure 1 , figure 2 The shown is a deep-water, high-pier and large-span bridge construction with a solid stone bare rock riverbed trestle, which includes a trestle body for constructing an underwater pier and a horizontal working platform 13 on the front side of the trestle body. The underwater pier is reinforced concrete Pier; the trestle body includes a lower support structure, a main beam 1 horizontally erected on the lower support structure and a deck 3 laid on the main beam 1, the lower support structure includes one or more lower anchors The steel pier anchoring piles 5 on the rock river bed 4 are arranged vertically, and a plurality of the steel pier anchoring piles are supported under the main beam 1 from back to front; the main beam 1 The front end of the pier is supported on the steel cofferdam 11 used to construct the underwater pier, and the rear end of the main beam 1 is supported on the shore support platform 10, which is a support platform erected ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a solid-stone bare-rock riverbed trestle used for the deepwater high-pier long-span bridge construction and a construction method thereof. The trestle includes a trestle body and a horizontal work platform located on the front side of the trestle body. The trestle body includes a lower-portion support structure, a main beam and a bridge deck; the lower-portion support structure includes one or more steel abutment anchoring piles, the lower portions of the steel abutment anchoring piles are anchored to a bare-rock riverbed, the front end of the main beam is supported ona steel cofferdam, the rear end of the main beam is supported on a shoreside surpport platform, and a concrete pumping pipe is placed on the bridge deck; the horizontal work platform is set up on thesteel cofferdam and is connected with the main beam, and each steel abutment anchoring pile includes a groined steel abutment and a steel abutment anchoring structure. The method includes the steps of1, construction of the steel abutment anchoring piles, 2, erecting of the main beam and 3, paving of the bridge deck. The solid-stone bare-rock riverbed trestle is reasonable in structural design, easy to construct and good in use effect, the steel abutment anchoring piles are stably supported on the bare-rock riverbed, the front end and rear end of the main beam are supported on the steel cofferdam and the shoreside support platform respectively, and labor and time are saved.

Description

Technical field [0001] The invention belongs to the technical field of bridge construction, and in particular relates to a solid rock and bare rock riverbed trestle bridge and a construction method for deep-water, high-pier and large-span bridge construction. Background technique [0002] With the development of the national economy, my country's railway bridge industry is developing rapidly. my country is catching up with or approaching the world's advanced level in bridge design theory, construction technology and equipment. The construction of large-span sea-crossing and river-crossing bridges is increasing. During the construction of the underwater piers of deep water, high piers, and long-span bridges, when the riverbed is a rocky and bare rock bed, the construction of the underwater piers is more difficult, and trestle bridges are usually erected. Among them, "deep water" means that the water depth of the bridge foundation is above 5m-6m, "high pier" means that the height o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00E01D15/133E01D19/00E01D19/02E02D5/38
Inventor 梁之海杜越刘俊斌赵久远朱山山严朝锋王永丽李东牛
Owner NO 1 ENG LIMITED OF CR20G
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products