A rapid subsidence construction device for a pile-anchor press-in caisson
A construction device and press-in technology, which is applied to caissons, sheet pile walls, foundation structure engineering, etc., can solve problems such as unfavorable shaft wall stress, high construction site requirements, and occupation of construction sites, and achieve simple and continuous construction procedures. The construction area is small and the effect of speeding up the construction speed
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2020-07-03
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of caisson construction, in particular to a rapid sinking construction device for a pile-anchor press-in type caisson. Background technique
[0002] The caisson is a construction method for underground engineering and deep-buried foundations. With the development of modern construction technology and construction machinery, the caisson has gradually become a common type of enclosure structure for deep-buried underground structures, and it is economical and reasonable. , Simple structure, easy to guarantee engineering quality and other advantages, it is widely used in underground structures, foundations, foundation pit support and other projects.
[0003] The sinking of the caisson mainly relies on its own weight to overcome the frictional resistance between the well wall and the soil and the resistance under the blade foot to sink to the design elevation. The choice of caisson sinking construction method de...
Examples
Embodiment
[0027] Example: such as Figure 1-8 As shown, this embodiment specifically relates to a rapid sinking construction device for pile-anchor press-in caissons, including anchor piles 2, anchor cables 3 and through-hole jacks 5, and the anchor piles 2 are pre-buried below the design elevation of the caisson 1 The soil forms a counter-force ground anchor, and the through-hole jack 5 is arranged above the well wall of the caisson 1, and the anchor cable 3 runs through the well wall of the caisson through the through hole 4, and one end is connected to the anchor pile 2, and the other end is connected to the oil cylinder of the through-hole jack 5 upper end. The construction device is used to provide a stable sinking force for the caisson 1, and can control the descending posture of the caisson 1, and has simple construction procedures, and is suitable for various irregularly shaped caissons.
[0028] Such as Figure 1-8 As shown, in this embodiment, the caisson 1 is a multi-row ca...