Cable bridge suspender installation method

A cable bridge and installation method technology, applied in the direction of electrical components, etc., can solve the problems of inconvenient installation of cable bridges in the basement, time-consuming and labor-intensive suspension rods, and many high-altitude operations, so as to achieve safe and reliable project quality, avoid high-altitude operations, and facilitate construction Effect

Inactive Publication Date: 2018-09-07
MCC5 GROUP CORP SHANGHAI
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The basement cable tray of Beichen Hanjiashu project is installed on the basement roof, and the clearance of the basement is 3.8m. Due to the high height, it will take time and effort to install the boom with sliding scaffolding, and there will be many high-altitude operations, which will be more dangerous
[0004] Therefore, there are above-mentioned inconveniences and problems in the known basement cable tray installation method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cable bridge suspender installation method
  • Cable bridge suspender installation method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0033] The cable bridge suspender installation method of the present invention comprises the following steps:

[0034] 1. Positioning of snapping lines: According to the design drawings, determine the installation positions of electrical appliances such as entry and exit lines, boxes, boxes, cabinets, etc., find out the horizontal or vertical lines, and perform snapping lines on the center line of the lines, and determine the drawings and specification requirements to determine each Mark the center position of the expansion bolt of each qualitative bracket.

[0035] 2. Design drilling tools for reserved holes for expansion screws

[0036] see now figure 1 , figure 1 It is a schematic diagram of the wooden frame structure of the drilling tool according to the embodiment of the present invention. As shown in the figure, the wooden frame of the drilling tool is made of 50mm wooden square as the upper and lower poles. The movable arm and the manual support arm are used to conne...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a cable bridge suspender installation method, which is characterized by comprising the following steps: a, cable bridge line line-snapping positioning; b, designing, and drilling tool manufacturing; c, cable bridge line expansion bolt reservation setting; d, cable bridge suspender installing. The cable bridge suspender installation method of the invention has the advantages of simple structure of the drilling tool, convenience to manufacture, reasonable design of the cable bridge suspender, convenience for construction, safe and reliable engineering quality, avoidanceof working at heights, improvement of the work efficiency, saving of the construction period and the construction cost and reduction of the engineering cost.

Description

technical field [0001] The invention relates to a cable bridge, in particular to a method for installing a suspension rod of a cable bridge. Background technique [0002] The bridge is a kind of supporting part for laying cables. It is relatively simple to install and convenient to repair and renovate. It is widely used in strong and weak current projects. Cable trays are generally divided into three types: trapezoidal, trough, and tray. All the bridges of this project are trough bridges. The inner and outer surfaces of the bridge frame are all electroplated. The cable bridge is in the stereotyped bracket. The stereotyped bracket consists of two parts: a three-piece set of expansion bolts, a boom and a support arm. The suspension rod is fixed on the beam or roof with steel expansion bolts, and the support arm is fixed on the suspension rod. [0003] The basement cable tray of Beichen Hanjiashu project is installed on the basement roof, and the clearance of the basement is...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H02G3/04
CPCH02G3/0456
Inventor 张允升李先南梁广远汪从刘宗宝
Owner MCC5 GROUP CORP SHANGHAI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products