Method and system for identifying construction progress of underground excavation station
A technology of construction progress and identification method, applied in the field of communication, can solve the problems of information transmission lag, unsuitable underground excavation of subway stations, and inability to track construction progress information in real time, saving time and labor, improving refined management and digital management Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] The embodiment of the present invention provides a method for identifying the construction progress of underground excavation stations, see figure 1 ,include:
[0044] S1. Create a building information model of the construction site of the underground excavation station;
[0045] S2. Receive the location data related to the construction progress collected by the positioning system, and convert the location data into construction progress data; the positioning system is arranged at the construction site of the underground excavation station;
[0046] S3. Control the display state of the building information model according to the construction progress data, and display the construction progress of the underground excavation station in three dimensions.
[0047] It should be noted that this embodiment creates a building information model BIM of the construction site of the underground excavation station, and develops a software identification platform based on BIM-GIS te...
Embodiment 2
[0081] The embodiment of the present invention also provides an identification system for the construction progress of the underground excavation station, which can realize all the processes of the above identification method for the construction progress of the underground excavation station, such as image 3 shown, including:
[0082] The positioning system 31 is arranged at the construction site of the underground excavation station, and is used to collect position data related to the construction progress;
[0083] A data interface 32, configured to receive the location data and convert the location data into construction progress data;
[0084] The software identification platform 33 includes a model creation module and a display module; the model creation module is used to create the building information model of the construction site of the underground excavation station; the display module is used to control the building information model of the building information mo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com