Large coin type compartment cofferdam and construction method
A cofferdam and coin technology, which is applied in the field of large-scale coin-type compartment cofferdam and construction, can solve the problems of high time and cost, and achieve the effects of reducing construction cost, good plugging effect, and preventing the cofferdam from floating
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] see Figure 1-4 , a large-scale coin-type compartment cofferdam, which includes a cofferdam 1, a plurality of bottom compartment chutes 4 are evenly distributed and fixedly installed on the inner wall of the cofferdam 1, and the bottom compartment chute 4 is connected with the bottom compartment The four corners of the cabin 2 form a sliding fit, and enable the bottom compartment 2 to slide down to the bottom along the inner wall of the cofferdam 1; The bottom of the flashboard 12 of the flashboard assembly 8 stretches into the rock face foundation 9 of the elevation change. By adopting the cofferdam with the above structure, after the steel cofferdam is assembled section by section and placed in place, the inserting plate assembly 8 is lowered to solve the problem of uneven bedrock at the bottom of the cofferdam, thereby ensuring the water isolation effect of the cofferdam; The compartment chute is lowered to the bottom compartment. When the thickness of the bottom co...
Embodiment 2
[0046] The construction method of any one of the described large-scale coin type compartment cofferdams, it may further comprise the steps:
[0047] Step1: Sink the cofferdam 1;
[0048] Step2: After the cofferdam 1 sinks in place, lower the bottom compartment 2 to the bottom of the cofferdam 1 through the bottom compartment chute 4;
[0049] Step3: Install the plug board 12 of the plug board assembly on the outer wall of the cofferdam 1 through the cooperation between the plug board guide rail 11 and the limit angle plate 13, and install it from the bottom of the cofferdam 1 to the leaking water surface;
[0050] Step4: According to the cooperation between the cofferdam edge 103 of the cofferdam 1 and the rock surface foundation 9 of the elevation change, the inserting plate 12 is inserted into the interior of the rock surface foundation 9 along the inserting plate guide rail 11 by knocking, And then the bottom of the cofferdam 1 is blocked;
[0051] Step5: According to the c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com