Method for treating plain river course
A river and plain technology, applied in the field of river management, can solve problems such as the decline of navigation capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The technical solution is described according to the accompanying drawings:
[0020] figure 2 As shown, a diversion dam 6 is built at the position between the canyon river and the plain river boundary point A and the plain river to the ground river boundary point B, and the reservoir formed by the diversion dam 6 blocking water is called a diversion reservoir; two river courses are divided from the diversion reservoir , one is the existing river channel in front of the dam. The water flow capacity of the existing river channel can meet the passage of the maximum water flow. This river is called the water flow river 4. The length of the water flow river 4 is from the diversion dam 6 to the dry water flow. The existing river course of Shuikou 10; The other is a river course constructed artificially, and the water flow capacity of this river course can meet the water flow during the dry season to pass through. This river course is called dry water river 5, and the length ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com