Integral green protective structure of subgrade slope and its construction method
A technology for protecting structures and slopes, applied in basic structure engineering, botanical equipment and methods, excavation, etc., can solve problems such as poor fixing effects of slopes, and achieve the effect of improving stability and strengthening anchoring effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0039] refer to figure 1 , is the overall green protective structure of the roadbed slope disclosed by the present invention, comprising a slope body 1, the surface of the slope body 1 is embedded with a main solid frame 2, the main solid frame 2 is grid-shaped, and the main solid frame 2 is fixedly connected with an anchor 3. The bottom of the anchor 3 extends toward the interior of the slope 1 until it penetrates below the surface of the slope 1, so that the anchor 3 anchors the main solid frame 2 and the deeper structure of the slope 1 together, and the main solid frame 2 It is not easy to move, and it plays a role in fixing the surface of the slope body 1, so that the surface layer of the slope body 1 is not easy to move, and the stability of the slope is improved.
[0040] refer to figure 1 and figure 2 , the main solid frame 2 is a reinforced concre...
Embodiment 2
[0045] The construction method of the integral green protective structure of the roadbed slope includes the following steps:
[0046] S1: Dig out a grid-shaped groove on the surface of the slope body 1, bind the steel cage in the groove, insert the bottom of the anchor tube 21 into the slope body 1, make the axis of the anchor tube 21 perpendicular to the surface of the slope body 1, and Weld the anchor tube 21 on the reinforcement cage;
[0047] S2: Support the formwork outside the reinforcement cage, then pour concrete, after the concrete hardens, form the main solid frame 2, and remove the formwork;
[0048] S3: Insert the anchor rod 311 into the limit groove 322, insert the anchor piece 3 into the anchor cylinder 21, and after inserting to a certain depth, pull out the outer cylinder for a section, then continue to insert the outer cylinder downward, and rotate the inner rod 32, until the fixing hole 4 of the inner rod 32 is aligned with the fixing cylinder 22, insert the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com