Power generation cost constraint-based multi-domain scheduling method considering energy storage power system
A technology of power generation cost and energy storage system, applied in wind power generation, system integration technology, information technology support system, etc., can solve problems such as inability to fully absorb wind power, high cost, redundant reserve capacity, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0136] Taking the dispatching scheme of a regional power grid system in Liaoning, my country as an example, verify the effectiveness and feasibility of the model and method of the present invention, wherein the structure of the regional power grid in Liaoning is as follows Figure 5 shown. The example system includes a wind power cluster with an installed capacity of 350MW and a thermal power unit with a total installed capacity of 600MW, and is equipped with a 120MW·h energy storage system. The minimum storage capacity is 15MW h, the initial energy storage is 20MW h, the rated charging and discharging power is 40MW, and the charging and discharging efficiency is 0.92.
[0137] (1) Objective function
[0138] Considering the cost of various regulation resources under different domains comprehensively, the generation cost is calculated according to the constraints under each domain in 96 scheduling periods.
[0139]
[0140] Table 1 Control variables in different regions ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com