Full-process automatic management system for industrial constructional engineering

A technology for automated management and industrial construction, applied in the field of full-process automated management systems for industrial construction projects, can solve the problems of low efficiency of internal data, easy to make mistakes, difficult to find and manage a large number of archives, time-consuming and paper-consuming, etc., so as to improve management efficiency. and software compatibility, improving efficiency and reducing costs

Pending Publication Date: 2020-06-12
叶志
View PDF7 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] The technical problem to be solved by the present invention is that the prior art has the following shortcomings: (1) manual signing of contracts and various internal business materials is inefficient and error-prone, it is difficult to search and manage a large number of archives, and information exchange is time-consuming through a large number of documents Paper;

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Full-process automatic management system for industrial constructional engineering
  • Full-process automatic management system for industrial constructional engineering

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0074] In the task acceptance stage, it realizes bidding reminder and process lock, and at the same time realizes that key parameters such as rate and budget are pushed to the contract signing position, which can track the contract signing status of the task order to speed up the contract process, and correlatively display the visa submission status, saving a lot of paper.

[0075] After entering the contract module, by analyzing the 14 variables of the general contract (11 variables of the subcontract): the double code verification of the contract number is realized to automatically compare and avoid multiple settlements of the contract; the basis for the establishment of the general contract, management personnel, engineering Commonly used data settings such as approval number and dictionary selection; calculation of construction costs based on documents and start and completion time; information price time; subcontract fee collection basis and bidding data are automatically a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a full-process automatic management system for industrial constructional engineering, which comprises a system assembly; the system assembly comprises a contract module, a costcontrol module, a dynamic management and control module, a visa online generation and auditing module and a report generation module; and the contract module realizes bid inviting reminding and process locking in a task undertaking stage, pushes key parameters such as rates and budget to a contract signing post, and can track the contract signing condition of a task list. Compared with the priorart, the system has the advantages that automatic generation of contracts and reports is realized, the efficiency is improved, the cost is reduced, errors are reduced, and paper is saved; and each piece of workflow information is dynamically shared, unnecessary repeated work is removed, and efficiency is improved. Meanwhile, dynamic tracking and management of a construction site are realized; thereal-time cost and the rural migrant worker salary are automatically calculated according to the contract and are tracked and displayed, so that remote management of engineering construction conditions and online auditing of visa data are realized; and management of various data and attachments is realized through ftp.

Description

technical field [0001] The invention relates to the field of construction engineering management, in particular to an automatic management system for the whole process of industrial construction engineering. Background technique [0002] The existing construction project management has the following deficiencies: (1) The common contract template mode is adopted for task order acceptance or contract signing. According to 15 common variables of industrial construction contracts, manual modification and editing are not performed. There is no process lock and error reminder, which is risky and time Longer, it is difficult to retrieve and manage materials in the existing mode, and the information cannot correspond to the original; [0003] (2) After the concealed acceptance of the construction site and the acceptance of visa documents, filling in the completion visa or acceptance documents lacks image data to prove the authenticity of the event, which is time-consuming and labor-...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F40/166G06F16/25G06Q10/10G06Q50/08
CPCG06F16/254G06Q10/103G06Q50/08
Inventor 叶志
Owner 叶志
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products