[0004] The technical problem to be solved by the present invention is to overcome the defects of the prior art and provide a construction
management system for old city renovation projects. The system architecture is composed of a cloud platform, an intelligent terminal, a display module, an information generation module, an acquisition module and a system
database , the
remote control operation platform completes the mutual control connection with the
smart phone, smart tablet and computer, so that the connection between each link constitutes stability, ensures strict control of the progress of each project during the construction process, and conducts unified planning , and uniformly arrange the next step of construction progress and work objectives; the reminder module group provided by the cloud platform, when the location of the construction process moves, the progress of the completion plan changes, and sudden safety liability accidents are all updated in time, and the real-time construction information is transmitted to the management personnel, and remind the management personnel in the form of
buzzer prompts, the acquisition module is based on the acquisition request of the management personnel, as well as the
engineering quantity data and the
simulation display database, and displays the simulated construction progress
data information; the display module is used to When requesting data import, obtain the information of the simulated display database in the data import request; the intelligent terminal is composed of the communication module and the cloud platform, and the
data transmission control is performed by the intelligent terminal. The positioning module is used to locate the location information of the construction site, and the positioning The module reports and transmits the geographic location information; the information generation module establishes project collection data through technology, and displays the project construction organization plan and main construction procedures to provide project collection data and construction progress information, and the construction information real-time collection module collects construction information Carry out automatic screening and transmit to the display module in the form of text; the input module includes a problem module group and a problem
record module group, and the problem
record module group analyzes the images collected by the
camera module and stores them in the problem
record module, and uploads them to the problem record module through the communication module Cloud platform; the input module records and stores important data in the construction process, construction progress, whether the planned progress is completed within the specified time, quality problems in the construction and production process, and safety problems in the construction and production process. From the generated actual project progress The display model obtains the actual project progress display model of the database, and transmits it to the display module for display. The
camera module performs
image acquisition work on the construction site. The construction project progress display model; the cloud platform includes construction information generation module and construction information real-time collection module, the intelligent terminal includes communication module, positioning module, input module and
camera module, and the system database provides the basis and guarantee for the operation of the cloud platform system. All
data information is stored in the database and displayed through the display module for managers to analyze data and complete the
management process of collecting data, analyzing data, obtaining results, solutions and specific implementation, so that the old city renovation project The construction management has a systematic control process; through the input module, the important data in the construction process, the construction progress, whether the planned progress is completed within the specified time, the quality problems in the construction and production process, and the safety problems in the construction and production process problem records and storage, and complete the transmission and reporting, so as to obtain the
time data in the complex data of the old city reconstruction complex, filling the intuitive understanding of the reconstruction complex, and at the same time further understanding and understanding during the specific construction process, and mastering the important The data information is convenient for the management and control personnel to timely grasp the information of various problems that arise during the construction of the project, and to formulate new treatment plans in a timely manner, ensuring the normal progress of the construction progress and the timely completion of the operation goals