A kind of municipal inspection well structure and construction method thereof
A construction method and inspection well technology, which is applied in the field of inspection wells, can solve problems such as the reduction of concrete layer strength, and achieve the effects of reducing voids, increasing strength, and improving reinforcement effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Embodiment 1: Reference figure 1 , is a municipal inspection well structure disclosed by the present invention, comprising a well pit 1, a pipeline 11 buried below the ground is arranged at the position of the well pit 1, the depth of the well pit 1 is greater than the buried depth of the pipeline 11, and the depth of the well pit 1 is The bottom is provided with a base 2, the base 2 is provided with a well body 3, the well body 3 is cylindrical, the well body 3 is vertically arranged, the side wall of the well body 3 is provided with a through hole 32, and the through hole 32 is used to connect the pipeline 11 penetrates into the well body 3, and the outside of the well body 3 is backfilled with buried soil.
[0040] refer to figure 1 and figure 2 , the well body 3 includes multi-layer modular blocks 31, and the multi-layer modular blocks 31 are assembled sequentially from bottom to top. Wrong stubble setting. The modular block 31 includes two main block bodies 31...
Embodiment 2
[0044] Embodiment two: reference figure 1 , is a municipal inspection well construction method disclosed by the present invention, which is used to construct a municipal inspection well structure in Embodiment 1, including excavating a well pit 1 first, and pouring a concrete base 2 at the bottom of the well pit 1 A well body 3 is built on the base 2, a concrete layer 33 is poured in the well body 3, a retaining ring 51 and a well cover 6 are installed on the upper end of the well body 3, and the outside of the well body 3 is backfilled.
[0045] refer to figure 1 and figure 2 , during the excavation process of the well pit 1, the depth of the well pit 1 is greater than the depth of the buried pipeline 11, so that the base 2 is all located under the pipeline 11. The diameter of the excavation of the well pit 1 is greater than the diameter of the well body 3, which is convenient for the staff to build the well body 3 in the well pit 1. In the process of building the well bo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com