Normalized delivery FH36 steel plate being100-120 mm thick and used for offshore wind power pipe pile and manufacturing method of steel plate

A technology for electric pipe piles and steel plates, applied in the field of alloy steel metallurgy, can solve the problems of insufficient production technology reserves and no public introduction to the production of extra-thick FH36 steel plates, and achieve the effects of high strength, good weldability, and easy rolling.

Active Publication Date: 2020-12-08
JIANGYIN XINGCHENG SPECIAL STEEL WORKS CO LTD
View PDF4 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] For the FH36 marine engineering steel plate delivered in a high-standard normalized state, the domestic production technology reserves are insufficient. The patent documents retrieved by the inventor of this case only involve the application of FH36 steel on LPG and LEG ships, and the thickness is less than 40mm. Introduction to the production of extra-thick FH36 steel plates for offshore wind power pipe piles

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Normalized delivery FH36 steel plate being100-120 mm thick and used for offshore wind power pipe pile and manufacturing method of steel plate
  • Normalized delivery FH36 steel plate being100-120 mm thick and used for offshore wind power pipe pile and manufacturing method of steel plate
  • Normalized delivery FH36 steel plate being100-120 mm thick and used for offshore wind power pipe pile and manufacturing method of steel plate

Examples

Experimental program
Comparison scheme
Effect test

preparation example Construction

[0045] A special thick 100-120mm offshore wind power pipe pile FH36 steel plate and its preparation method for delivery in a normalized state according to Embodiment 1-6 of the present invention include the following steps:

[0046] (1) Smelting: Smelting in a 150-ton converter, and then sent to the LF furnace for refining and RH vacuum degassing treatment, and Ca treatment in the air.

[0047] (2) Continuous casting: cast the smelted molten steel into continuous casting slabs with a thickness of 360 mm to 450 mm. The casting temperature is controlled at 10-20°C above the liquidus line. Dynamic soft reduction is implemented during the casting process.

[0048] (3) Slab Hydrogen Expansion Treatment: The continuous casting slab is put into the pit for slow cooling and hydrogen expansion, and the time in the pit is 48-72 hours.

[0049] (4) Rolling: Put the continuous casting slab obtained in step (3) into a walking heating furnace, heat the continuous casting slab to 1180-1220...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a normalized delivery FH36 steel plate being 100-120 mm thick and used for an offshore wind power pipe pile. Chemical components based on the national standard GB712 and classification society specifications comprise, by weight percentage, 0.11-0.13% of C, 0.15-0.50% of Si, 1.20-1.60% of Mn, smaller than or equal to 0.0070% of P, smaller than or equal to 0.0030% of S, 0.030-0.060% of Nb, 0.020-0.050% of Al, 0.008-0.030% of Ti, 0.40-0.80% of Ni, 0.10-0.20% of Cr, 0.10-0.35% of Cu, 0.0005-0.0050% of Ca, and the balance Fe. The carbon equivalent CEV is smaller than or equal to 0.49%. Proeutectoid ferrite and needle-shaped ferrite are adopted as a matrix structure. The average crystal grain size is 6-15 micrometers. Due to center segregation of a continuous cast blank,a small amount of strip pearlite is possibly generated on a core portion of the steel plate. The manufacturing flow of the steel plate comprises the steps of converter treatment, LF refining, RH vacuum degassing, Ca treatment, continuous casting, cast blank dehydrogenation treatment, heating, rolling and normalizing.

Description

technical field [0001] The invention belongs to the field of alloy iron and steel metallurgy, and specifically relates to an FH36 steel plate for extra-thick offshore wind power pipe piles delivered in a normalized state and a production method thereof. Background technique [0002] Offshore wind power has sprung up suddenly, and the installed capacity has grown rapidly year after year, especially in the coastlines of Jiangsu, Fujian, Guangdong, Shandong and other provinces in my country. The development of the offshore wind power industry has led to the rapid development of the technology of offshore wind turbines and their supporting materials. The installation of wind turbines has gradually extended from offshore to shallow seas and to cold areas. At present, the northernmost offshore wind turbine in China has been installed in Zhuanghe, Dalian, Liaoning. With the development of larger capacity, the steel for offshore wind power is also developing from the commonly used D...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): C22C38/02C22C38/04C22C38/06C22C38/48C22C38/50C22C38/42C22C38/58C22C33/04C21D8/02C21D1/28
CPCC22C38/02C22C38/04C22C38/06C22C38/48C22C38/50C22C38/42C22C38/58C22C33/04C21D8/0226C21D8/0242C21D8/0247C21D1/28C21D2211/005C21D2211/009
Inventor 刘朝霞许晓红刘俊孟羽高俊徐光琴韩步强周永浩
Owner JIANGYIN XINGCHENG SPECIAL STEEL WORKS CO LTD