Prestressed post-inserted composite anchor cable uplift pile and preparation method thereof

An uplift pile and prestressing technology, applied in sheet pile wall, construction, infrastructure engineering, etc., can solve the problems of bearing capacity pollution, vibrating rod vibration or chaotic construction accident, corrosion and other problems
CN112095586AInactive Publication Date: 2020-12-18CHINA BUILDING TECHN GROUP +1

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
CHINA BUILDING TECHN GROUP
Publication Date
2020-12-18
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention belongs to the field of underground construction, and particularly relates to a prestressed post-inserted composite anchor cable uplift pile and a preparation method thereof. The upliftpile comprises an uplift pile composite reinforcement cage, a composite anchor cable and a filler, wherein the uplift pile composite reinforcement cage comprises an uplift pile cage outer wall and anuplift pile cage inner wall; the composite anchor cable is arranged between the uplift pile cage outer wall and the uplift pile cage inner wall, and consists of an isolation body and an uplift anchorcable arranged in the isolation body; the isolation body isolates a corrosive from the uplift anchor cable; and a steel plate anchoring end is arranged at the lowermost side, and is connected with theisolation body. The uplift pile has the advantages of good overall performance, high bearing capacity, no mud pollution, low manufacturing cost, corrosion resistance and high construction speed; andthe upper part of a pile body is always located in a pressed state to prevent cracks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field

[0001] The invention belongs to the field of underground construction, and specifically relates to a pre-stressed post-insertion composite anchor-cable pull-out pile and a preparation method thereof.Background technique

[0002] There are four main engineering situations that require the use of uplift piles: the groundwater level of the project is high, and the upper part of the project is thinner or the weight of the superstructure cannot offset the buoyancy of the groundwater. At this time, under the action of the buoyancy of the groundwater, the engineering structure part Or the whole body will be pulled up, causing the building to move upward. This situation often occurs in the basement of buildings, underground parking lots and so on. At this time, it is necessary to design uplift piles to avoid these situations.

[0003] The engineering structure may be subjected to huge horizontal loads during construction or later use, such as bridge abutments, inclined piles of retain...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine