An ecological block guide drainage ditch and its parameter determination method
A block and ecological technology, applied in the field of ecological block guide gutter and its parameter determination, can solve the problems of dredging, easy embedding of blockages, purification, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046]The drainage side ditch proposed by the invention uses an impermeable cement board as the bottom of the ditch, so that in arid and semi-arid regions, the infiltration loss of rainwater runoff and the loss along the ditch can be prevented, water saving can be achieved, and road runoff pollutants can be minimized to the greatest extent. The land is controlled within the range of the road area to prevent interference to the surrounding environmental ecosystem; the ecological blocks of fill and vegetation stacked in steps form the ditch wall, which has better ecological performance than the traditional side ditch, and can pass the vegetation of the ditch wall. The growth realizes the shielding and blanking of the overall side ditch; water-retaining bricks are arranged at a certain distance along the bottom of the ditch as water-retaining weirs. At the same time, the runoff can be further precipitated and purified. When the rainfall is heavy, the water flow higher than the ret...
Embodiment 2
[0126] A certain highway is located in a semi-arid area. Due to the early construction, the impact of road and bridge deck runoff on river water quality and the possible leakage risk of highway transportation of dangerous goods were not considered at that time. The safety of water quality brings huge hidden dangers. In the event of an accident such as the transportation and leakage of dangerous goods, the consequences will be unimaginable.
[0127] The originally designed roadbed side ditch, the width of the ditch bottom is b1=0.6m, the side slope ratio is 1:1, and h1=0.6m.
[0128] In recent years, reconstruction has been carried out, the side ditch of the subgrade section has been replaced by the reconstruction, and street trees have been planted next to the subgrade. The adopted scheme is as follows:
[0129] The impermeable cement board is used as the bottom of the ditch, and the ecological blocks stacked in steps form the ditch wall. Amorpha is planted in the ecological b...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com